PROJECT DETAILS

Project Submission No. S00153
Project Title Topçam Dam and Hydro Power Plant
Project Owner(s) (as per PSF & LOA) Bilgin Güç Santralleri Enerji Üretim A.Ş.
Submission Date 2022-02-22
Global Stakeholder Consultation Period 2022-04-03 to
2022-04-17
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Hydro Power
GCC/CDM Methodology & Version ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0)
Forecasted GHG Emission Reduction (tCO2e/Year) 111,040
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Platinum
Forecasted Market Eligibility C+ - Pilot Phase
Country
 Türkiye
Focal Point of Project Owners
Bilgin Güç Santralleri Enerji Üretim A.Ş.
Email of Contact Person of FP (Primary) altug@bilgin.com.tr
Email of Contact Person of FP (Secondary) baharsu.akdag@bilgin.com.tr
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

Bilgin Güç Santralleri Enerji Üretim A.Ş. is operating a hydropower plant in Mesudiye district, Ordu province, Turkey. Based on the applied tool, the project boundary is considered as the National Electricity Grid of Turkey. The baseline scenario refers to the energy generation from the fossil fuels.The project includes 3 units. All of them have 20.87 MWm/ 20.45 MWe installed capacity. The total installed capacity is 62.61 MWm / 61.35 MWe. Annual electricity production is expected to be 200,000,000 kWh according to the generation license. Because of avoiding using fossil fuels, greenhouse gas emission reductions can be achieved. The average annual generated electricity is expected to be 200,000 MWh according to the generation license and the emission reduction is estimated around 111,040 tCO2e annually.