| Project Submission No. | S01264 |
|---|---|
| Project Title | 20 MW Gandhar Solar PV Project |
| Project Owner(s) (as per PSF & LOA) | NTPC LIMITED |
| Submission Date | 2024-06-11 |
| Global Stakeholder Consultation Period |
2024-07-01 to 2024-07-15 |
| Registration Date | 2026-06-15 |
| Sector | 1.Energy industries (renewable-/non-renewable sources) |
| Project Type | Solar Power |
| GCC/CDM Methodology & Version | ACM0002 Grid-connected electricity generation from renewable sources, Version-22.0 |
| Forecasted GHG Emission Reduction (tCO2e/Year) |
|
| Verified GHG Emission Reduction (tCO2e/Year) |
|
| Forecasted E+ Label | Yes |
| Verified E+ Label | Yes |
| Forecasted S+ Label | Yes |
| Verified S+ Label | Yes |
| Forecasted SDG+ Goals |
|
| Verified SDG+ Goals |
|
| Forecasted SDG+ Label | Silver |
| Verified SDG+ Label | Silver |
| Forecasted Market Eligibility | |
| Verified Market Eligibility |
|
Location Details
Open Full Map
|
|
| Country |
India
|
|---|---|
|
Focal Point of Project Owners
|
Infinite Environmental Solutions Limited |
| Email of Contact Person of FP (Primary) | jimmy@infisolutions.org |
| Email of Contact Person of FP (Secondary) | sumeet@infisolutions.org |
| Name of Authorized External Representative Organization | INFINITE ENVIRONMENTAL SOLUTIONS LLP |
| Name of Focal Point of External Representative | JIMMY SAH |
| Email-id of External representative | jimmy@infisolutions.org |
| Project Verifier | LGAI TECHNOLOGICAL CENTER, S.A. |
| Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
| Request For Registration Documents | Verified Project Submision
Verified Calculation Sheet Other Verified Documents |
| Request for Registration Form | Registration Form |
| Project Brief | The project activity is the installation of 20 MW solar photovoltaic power plant/unit with the purpose of generation of clean electricity by harnessing the renewable “Solar Energy”. The project is Commissioned in Gandhar village of Bharuch district of Gujarat in India by NTPC Limited. |
|---|---|
| Additional Information | NTPC Limited is the project Implementer. The annual average net electricity generation from the project activity is estimated to be 40,085 MWh. By displacing this amount electricity from fossil-fuel based power plants, the project activity is expected to reduce 37,487 tCO2e GHG emissions annually and 374,874 tCO2e over the entire crediting period of 10 years. |
| Report (Public) | Verification Report (public) |
|---|---|
| Verification report date | 2026-05-26 |
| First Request for Registration Date | 2025-06-02 |
| Opinion | The GCC Project Verifier, LGAI Technological Center S.A. (Applus+ Certification), has verified and certified that the GCC Project Activity – ‘20 MW Gandhar Solar PV Project, India’ has correctly described the Project Activity in the Project Submission Form version 3.4 dated 15/05/2026 including the applicability of the approved CDM methodology ACM0002 version 22.0. and meets the methodology applicability conditions, is additional and is expected to achieve the forecasted real and additional GHG emission reductions, complies with the monitoring methodology, has appropriately conducted local and global stakeholder consultation processes and has calculated emission reduction estimates correctly and conservatively; is likely to generate GHG emission reductions amounting to the estimated 37,487 tCO2e annual average, as indicated in the PSF which are additional to the reductions that are likely to occur in absence of the Project Activity and complies with all applicable GCC rules, including ISO 14064-2:2019 and ISO 14064-3:2019 and therefore requests the GCC Program to register the Project Activity; is not likely to cause any net-harm to the environment and/or society and complies with the Environmental and Social Safeguards Standard, and therefore requests the GCC Program to register the Project Activity, which is likely to achieve the requirements of the Environmental No-net-harm Label (E+) and the Social No-net-harm Label (S+); and is likely to contribute to the achievement of United Nations Sustainability Development Goals (SDGs), comply with the Project Sustainability Standard and contribute to achieving a total of 3 SDGs, which is likely to achieve the Silver SDG certification label (SDG+). |