PROJECT DETAILS

Project Submission No. S01263
Project Title 100 MW Ramagundam Floating Solar PV Project
Project Owner(s) (as per PSF & LOA) NTPC Limited
Submission Date 2024-06-11
Global Stakeholder Consultation Period 2024-07-01 to
2024-07-15
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Solar Power
GCC/CDM Methodology & Version ACM0002 Grid-connected electricity generation from renewable sources, Version-21.0
Forecasted GHG Emission Reduction (tCO2e/Year) 202,079
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Silver
Forecasted Market Eligibility C+ - Pilot Phase
Location Details Open Full Map
Country
 India
Focal Point of Project Owners
Infinite Environmental Solutions Limited
Email of Contact Person of FP (Primary) jimmy@infisolutions.org
Email of Contact Person of FP (Secondary) sumeet@infisolutions.org
Name of Authorized External Representative Organization Infinite Environmental Solutions LLP
Name of Focal Point of External Representative Jimmy Sah
Email-id of External representative jimmy@infisolutions.org
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

The proposed project activity is the installation of 100 MW floating solar photovoltaic power plant/unit with the purpose of generation of clean electricity and contributing to achieve the requirements of the Green Economy Strategy of the country by harnessing the renewable “Solar Energy”. NTPC Limited commissioned a floating solar project in 2021 with capacity of 100 MW, Fully commissioned on 01/07/2022. The project is being implemented in Ramagundam Village of Peddapalli District of Telangana state in India by NTPC Limited.

Additional Information

The electricity generated from project activity is exported to the Indian grid in India there by displacing the consumption of electricity from the regional grid electricity distribution system. The electricity generated by the project activity thus replaces the equivalent amount of electricity generated by the operation of existing/ grid connected power plants (mostly fossil fuel based power plants) and by addition of new generation sources into the grid.