Project Brief |
Çataltepe WPP (hereafter referred as “Project”) is a new built wind-farm project, located in İstanbul Province, Turkey owned by Süper Elektrik Üretim A.Ş. The generation license of the project was issued in 04/01/2012 for 49 years. The project has an installed capacity of 12 MWm/10 MWe, and annual generation is estimated to be 37,856 MWh. The purpose of the Project is to produce renewable electricity using wind as the power source and to contribute to Turkey’s growing electricity demand through a sustainable and low carbon technology. The project will displace the same amount of electricity generated by the grid dominated with fossil fired power plants. The annual emission reduction estimated by the project is 24,538 tonnes of CO2. During the crediting period, 245,379 tonnes of CO2 are expected to be reduced. |