PROJECT DETAILS

Project Submission No. S01266
Project Title Zhangbei Xinglongwa 50MW Solar Power Project (Phase I 30MW)
Project Owner(s) (as per PSF & LOA) Beijing BOE Energy Technology Co., Ltd.
Submission Date 2024-03-12
Global Stakeholder Consultation Period 2024-07-04 to
2024-07-18
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Solar Power
GCC/CDM Methodology & Version ACM0002: Grid-connected electricity generation from renewable sources” (Version 20.0)
Forecasted GHG Emission Reduction (tCO2e/Year) 37,686
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Gold
Forecasted Market Eligibility C+ - Pilot Phase
Location Details Open Full Map
Country
 China
Focal Point of Project Owners
Beijing BOE Energy Technology Co., Ltd.
Email of Contact Person of FP (Primary) zhangxiaomeng@boe.com.cn
Email of Contact Person of FP (Secondary) humingzhou@boe.com.cn
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

Zhangbei Xinglongwa 50MW Solar Power Project (Phase I 30MW) (hereafter referred to as “the 
Project” or “the proposed project”) is a solar photovoltaic power project with a total installed capacity 
of 30MW which is developed by Hebei Runyang Solar Power Generation Co., Ltd. The Project
locates at the northwest of Zhangbei County, Zhangjiakou City, Hebei Province, China, about 36km 
away from Zhangbei County.

The purpose of the Project is to utilize the solar energy to generate and supply electricity to Northern 
China Power Grid (NCPG). The spatial extent of the project boundary includes the project power 
plant and all power plants connected physically to NCPG that the project is connected to.

Prior to the implementation of the Project, the electricity delivered to the grid by the project activity 
would be generated by the operation of grid-connected power plants and by the addition of new 
generation sources into the NCPG. This is also the baseline scenario.

The Project is a renewable energy project and is expected to supply an annual average of 45576MWh 
of zero-emission electricity to NCPG during the fixed 10-year crediting period, which will replace 
power generation of those fossil fuel-fired power plants delivered to the NCPG under the baseline 
scenario. The project is expected to achieve a green-house gas emission reduction of 37686tCO2e 
annually and the total emission reductions during the fixed 10-year crediting period will be 
376862tCO2e. 

The project is expected to contribute to 4 SDGs which are SDG 7, 8, 9,13.