Project Submission No. S00856
Project Title Acarsoy Biomass Power Plant Project
Project Owner (as per PSF & LOA) Acarsoy Enerji Elektrik Üretim Sanayi ve Tic. A.Ş
Focal Point of Project Owners*(FP)
Life Iklim ve Enerji Ltd. Sti.
Email of Contact Person of FP (Primary) ramazan.aslan@lifeenerji.com
Email of Contact Person of FP (Secondary) -
Country Türkiye
Submission Date 15 Feb 2022
Global Stakeholder Consultation Period 29 Jan 2023 - 12 Feb 2023
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version ACM0018 “Large-scale Consolidated Methodology: Electricity generation from biomass in power-only plants”, Version 5.0
Forecasted GHG Emission Reduction(TCO2/Year) 43,674
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals 6,7,8,9
Forecasted SDG+ Label Platinum
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization Life İklim ve Enerji Ltd. Şti.
Name of Focal Point of External Representative Ramazan Aslan
Email-id of Focal Point ramazan.aslan@lifeenerji.com
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet, Other Documents
Project Brief

Acarsoy Biomass Power Plant Project has 15.8 MWe installed capacity, and the project is expected to produce 110,600 MWh of gross electricity annually. The voltage is stepped up to 154 kV, and the power is fed to the grid through the Denizli-4 TM- Denizli Çimento TM (Substation) of the Turkish Electricity Transmission Company (TEİAŞ). It is foreseen that approximately 138,055,200 kg of agricultural and forestry waste will be incinerated annually. The construction of the power plant was started in September 2019 with the Construction Agreement signed with the  contractor company, and the plant started generating electricity on 25/10/2020. The plant is currently fully operational. The plant is located in Gürlek Neighbourhood at Honaz District, to the southwest of the province of Denizli. 