| Project Submission No. | S01161 |
|---|---|
| Project Title | 56 MW Kawas Solar PV Project |
| Project Owner(s) (as per PSF & LOA) | NTPC LIMITED |
| Submission Date | 2024-02-16 |
| Global Stakeholder Consultation Period |
2024-02-29 to 2024-03-14 |
| Registration Date | 2026-04-22 |
| Sector | 1.Energy industries (renewable-/non-renewable sources) |
| Project Type | Solar Power |
| GCC/CDM Methodology & Version | ACM0002 Grid-connected electricity generation from renewable sources, Version-21.0 |
| Forecasted GHG Emission Reduction (tCO2e/Year) |
|
| Verified GHG Emission Reduction (tCO2e/Year) |
|
| Forecasted E+ Label | Yes |
| Verified E+ Label | Yes |
| Forecasted S+ Label | Yes |
| Verified S+ Label | Yes |
| Forecasted SDG+ Goals |
|
| Verified SDG+ Goals |
|
| Forecasted SDG+ Label | Silver |
| Verified SDG+ Label | Silver |
| Forecasted Market Eligibility | |
| Verified Market Eligibility |
|
Location Details
Open Full Map
|
|
| Country |
India
|
|---|---|
|
Focal Point of Project Owners
|
Infinite Environmental Solutions Limited |
| Email of Contact Person of FP (Primary) | jimmy@infisolutions.org |
| Email of Contact Person of FP (Secondary) | sumeet@infisolutions.org |
| Name of Authorized External Representative Organization | Infinite Environmental Solutions Limited |
| Name of Focal Point of External Representative | Jimmy Sah |
| Email-id of External representative | jimmy@infisolutions.org |
| Project Verifier | LGAI TECHNOLOGICAL CENTER, S.A. |
| Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
| Request For Registration Documents | Verified Project Submision
Verified Calculation Sheet Other Verified Documents |
| Request for Registration Form | Registration Form |
| Project Brief | The project activity is the installation of 56 MW Greenfield solar photovoltaic power plant/unit with the purpose of generation of clean electricity and contributing to achieve the requirements of the Green Economy Strategy of the country by harnessing the renewable “Solar Energy”. The project is a mix of 31MW (46.5 MWp) Ground mounted solar component and 25 MW (33.77 MWp) floating solar component developed inside the existing NTPC Kawas Gas based power station. |
|---|---|
| Additional Information | NTPC Limited is the project Implementer and the crediting period for the project activity “56 MW Kawas Solar PV Project” is 10 years crediting period i.e., from 15/08/2022 to 14/08/2032 (Inclusive of both the dates) in which total estimated electricity generation is 1,307,455 MWh and total GHG emission reduction estimated is 1,222,728 tCO2e. Also, the annual average estimated emission reductions from project activity are 122,272 tCO2e/annum. |
| Report (Public) | Verification Report (public) |
|---|---|
| Verification report date | 2026-03-20 |
| First Request for Registration Date | 2024-09-10 |
| Opinion | LGAI Technological Center S.A. (Applus+ Certification) has performed a verification of the “56 MW Kawas Solar PV Project”. The verification is performed on the basis of GCC criteria project verification standard, Version 3.1 for the project activity, GCC guideline and host country criteria, as well as criteria given to provide for consistent project operations, monitoring and reporting. The review of the final version of GCC PSF and the subsequent Onsite Visit / follow-up interviews has provided Applus+ Certification with sufficient evidence to determine the fulfilment of stated criteria. In our opinion, the project meets all relevant GCC project standard requirements for the GCC. The project will hence be recommended by LGAI Technological Center S.A. (Applus+ Certification) for registration with the GCC. By displacing fossil fuel-based electricity with electricity generated from a renewable source, the project results in reductions of CO2 emissions that are real, measurable and give long-term benefits to the mitigation of climate change. Emission reductions attributable to the project are hence additional to any that would occur in the absence of the project activity. Given that the project is implemented as designed, the project is likely to achieve the estimated amount of annual emission reductions of 122,272 tCO2e per year. The verification has been performed following the requirements of the latest version of GCC verification standard, Version 03.1, GCC Project Standard, version 03.1 and on the basis of the contractual agreement. In detail the conclusions can be summarized as follows: - The project does not result in negative social, environmental and/or economic impacts. - The project contribution to Environment, Social Development and Economic and technological development - The project additionality is sufficiently justified in the GCC PSF. - Conservative assumptions were applied in the project description. - The monitoring plan of SDG parameters is transparent and adequate. - The project meets the local stakeholder consultation requirements. The conclusions of this report show that the project, as it was described in the project documentation, is in line with all criteria applicable for the verification. |