| Project Submission No. | S01158 |
|---|---|
| Project Title | 300 MW Solar Project in Rajasthan |
| Project Owner(s) (as per PSF & LOA) | 1.Azure power maple private limited 2.Azure Power India Private Limited |
| Submission Date | 2024-02-13 |
| Global Stakeholder Consultation Period |
2024-02-29 to 2024-03-14 |
| Registration Date | 2026-06-26 |
| Sector | 1.Energy industries (renewable-/non-renewable sources) |
| Project Type | Solar Power |
| GCC/CDM Methodology & Version | ACM0002 Grid-connected electricity generation from renewable sources, Version 21.0 |
| Forecasted GHG Emission Reduction (tCO2e/Year) |
|
| Verified GHG Emission Reduction (tCO2e/Year) |
|
| Forecasted E+ Label | Yes |
| Verified E+ Label | Yes |
| Forecasted S+ Label | Yes |
| Verified S+ Label | Yes |
| Forecasted SDG+ Goals |
|
| Verified SDG+ Goals |
|
| Forecasted SDG+ Label | Silver |
| Verified SDG+ Label | Silver |
| Forecasted Market Eligibility | |
| Verified Market Eligibility |
|
Location Details
Open Full Map
|
|
| Country |
India
|
|---|---|
|
Focal Point of Project Owners
|
Azure Power India Private Limited |
| Email of Contact Person of FP (Primary) | reenu.gaur@azurepower.com |
| Email of Contact Person of FP (Secondary) | kompella.srinivas@azurepower.com |
| Project Verifier | LGAI TECHNOLOGICAL CENTER, S.A. |
| Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
| Request For Registration Documents | Verified Project Submision
Verified Calculation Sheet Other Verified Documents |
| Request for Registration Form | Registration Form |
| Project Brief | The Purpose of this project activity is to generate electricity by harnessing the solar energy by using solar photovoltaic technology and there by feed the generated electricity to the Indian national grid. Project activity involves installation of Solar photovoltaic power generation project in Jodhpur district of Rajasthan State of India. The Project activity has installed the Solar Photovoltaic based Panels to convert the available solar radiation into the DC power and there by installed the Inverters to convert the DC power to the AC Power. |
|---|---|
| Additional Information | The project is implemented by M/s Azure Power Maple Pvt. Ltd. The project is under commissioning process. The project has been connected to the National Grid through the locally available 33/220 kV at ISTS substation. |
| Report (Public) | Verification Report (public) |
|---|---|
| Verification report date | 2026-06-03 |
| First Request for Registration Date | 2025-02-06 |
| Opinion | LGAI Technological Center S.A. (Applus+ Certification) has performed a verification of the “300 MW Solar Project in Rajasthan”. The verification is performed on the basis of GCC criteria project verification standard, Version 3.1 for the project activity, GCC guideline and host country criteria, as well as criteria given to provide for consistent project operations, monitoring and reporting. By displacing fossil fuel-based electricity with electricity generated from a renewable source, the project results in reductions of CO2 emissions that are real, measurable and give long-term benefits to the mitigation of climate change. Emission reductions attributable to the project are hence additional to any that would occur in the absence of the project activity. Given that the project is implemented as designed, the project is likely to achieve the estimated amount of annual average emission reductions of 753,026 tCO2e per year. The conclusions of this report show, that the project, as it was described in the project documentation, is in line with all criteria applicable for the verification. |