| Project Submission No. | S01157 |
|---|---|
| Project Title | 28 MW Solar Power Project in Punjab |
| Project Owner(s) (as per PSF & LOA) | 1. Azure power makemake private Limited 2. Azure power India Private Limited |
| Submission Date | 2024-02-13 |
| Global Stakeholder Consultation Period |
2024-02-29 to 2024-03-14 |
| Registration Date | 2025-09-23 |
| Sector | 1.Energy industries (renewable-/non-renewable sources) |
| Project Type | Solar Power |
| GCC/CDM Methodology & Version | ACM0002 Grid-connected electricity generation from renewable sources, ver 21.0 |
| Forecasted GHG Emission Reduction (tCO2e/Year) |
|
| Verified GHG Emission Reduction (tCO2e/Year) |
|
| Forecasted E+ Label | Yes |
| Verified E+ Label | Yes |
| Forecasted S+ Label | Yes |
| Verified S+ Label | Yes |
| Forecasted SDG+ Goals |
|
| Verified SDG+ Goals |
|
| Forecasted SDG+ Label | Silver |
| Verified SDG+ Label | Silver |
| Forecasted Market Eligibility | C+ - Pilot Phase |
| Verified Market Eligibility | C+ - Pilot Phase |
|
Location Details
Open Full Map
|
|
| Country |
India
|
|---|---|
|
Focal Point of Project Owners
|
Azure Power India Private Limited |
| Email of Contact Person of FP (Primary) | reenu.gaur@azurepower.com |
| Email of Contact Person of FP (Secondary) | kompella.srinivas@azurepower.com |
| Email-id of External representative | reenu.gaur@azurepower.com |
| Project Verifier | LGAI TECHNOLOGICAL CENTER, S.A. |
| Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
| Request For Registration Documents | Verified Project Submision
Verified Calculation Sheet Other Verified Documents |
| Request for Registration Form | Registration Form |
| Project Brief | The Purpose of this project activity is to generate electricity by harnessing the solar energy by using of solar photovoltaic technology and there by feed the generated electricity to the Indian national grid. Project activity involves installation of two Solar photovoltaic power generation project in Punjab at two different locations with installed capacities of 4 MW and 24 MW each with total project capacity of 28 MW. The project is installed in Sri Muktsar Sahib districts of Punjab State of India. The Project activity has installed the Solar Photovoltaic based panels to convert the available solar radiation into the DC power and there by installed the inverters to convert the DC power to the AC Power. |
|---|---|
| Additional Information | The project is implemented by Azure Power Makemake Private Ltd., a subsidiary of Azure Power India Private Ltd. The project is commissioned and currently operational. The project has been connected to the National Grid through the locally available substations. The generated power from the project activity is supplying to the Punjab State Power Corporation Ltd. (PSPCL) which is a part of Indian National gird. Project Owners have signed long-term Power Purchase agreement with the PSPCL to supply the generated solar power at a fixed price. |
| Report (Public) | Verification Report (public) |
|---|---|
| Verification report date | 2025-09-17 |
| First Request for Registration Date | 2024-11-25 |
| Opinion | The GCC Project Verifier, LGAI Technological Center S.A., has verified and certified that the GCC Project Activity – ‘28 MW Solar Power Project in Punjab’ has correctly described the Project Activity in the Project Submission Form (version 13.0), dated 15/09/2025 including the applicability of the approved methodology ACM0002 version 21.0. and meets the methodology applicability conditions, is additional and is expected to achieve the forecasted real, measurable and additional GHG emission reductions, complies with the monitoring methodology, has appropriately conducted local and global stakeholder consultation processes and has calculated emission reduction estimates correctly and conservatively; is likely to generate GHG emission reductions amounting to the estimated 39,887 tCO2e annual average, as indicated in the PSF which are additional to the reductions that are likely to occur in absence of the Project Activity and complies with all applicable GCC rules, including ISO 14064-2 and ISO 14064-3 and therefore requests the GCC Program to register the Project Activity; is not likely to cause any net-harm to the environment and/or society and complies with the Environmental and Social Safeguards Standard, and therefore requests the GCC Program to register the Project Activity, which is likely to achieve the requirements of the Environmental No-net-harm Label (E+) and the Social No-net-harm Label (S+); and is likely to contribute to the achievement of United Nations Sustainable Development Goals (SDGs) , comply with the Project Sustainability Standard and contribute to achieving a total of 3 SDGs, which is likely to achieve the Silver SDG certification label (SDG+). |