PROJECT DETAILS

Project Submission No. S01186
Project Title Adares WPP Capacity Addition Project
Project Owner(s) (as per PSF & LOA) EKI Energy Services Limited
Submission Date 2023-12-20
Global Stakeholder Consultation Period 2024-03-19 to
2024-04-02
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Wind Power
GCC/CDM Methodology & Version ACM0002 Grid-connected electricity generation from renewable sources - Version 21.0
Forecasted GHG Emission Reduction (tCO2e/Year) 17,810
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Silver
Forecasted Market Eligibility C+ - Pilot Phase
Location Details Open Full Map
Country
 Türkiye
Focal Point of Project Owners
EKI Energy Services Limited
Email of Contact Person of FP (Primary) manish@enkingint.org
Email of Contact Person of FP (Secondary) naveen@enkingint.org
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

The Adares WPP Capacity Addition Project (referred to as the proposed project from here on) was built and developed by YGT Elektrik Üretim Anonim Şirketi (referred to as project owner from here on). The project activity is in the Selçuk/Kuşadası district of Türkiye’s western İzmir province. The project activity involves the installation of 5 wind turbines, each with a capacity of 2.00 MW, making the total installed capacity addition to 22 MW. The project owner built 3 more turbines in 2021 and increased the 10 MW capacity of the existing Adares WPP to 22 MW with the 12 MW capacity of the proposed project. The proposed project activity consists of only the capacity addition to the existing Adares WPP. The generation license of the existing plant has been revised and increased to 22 MWh from 10 MW on 17/12/2020. As per the license issued by the EMRA, all legal rights of the project are granted to YGT Elektrik Üretim Anonim Şirketi for 49 years, including pre-construction and construction periods.