Project Submission No. S01245
Project Title Jeddah South Solar PV Project
Project Owner(s) (as per PSF & LOA) Neom Energy and Water Company
Submission Date 2023-12-13
Global Stakeholder Consultation Period 2024-05-21 to
2024-06-04
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Solar Power
GCC/CDM Methodology & Version GCCM001 V4.0: Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers
Forecasted GHG Emission Reduction (tCO2e/Year) 503,073
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Diamond
Forecasted Market Eligibility C+ - Pilot Phase
Location Details Open Full Map
Country
 Saudi Arabia
Focal Point of Project Owners
Neom Energy and Water Company
Email of Contact Person of FP (Primary) thorsten.bomm@neom.com
Email of Contact Person of FP (Secondary) fares.bahareth@neom.com
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

The proposed project activity is the installation of a new grid-connected 300 MW Solar power plant at a
site where no renewable power plant was operating prior to the implementation of the project activity.
The project activity is solar power project, which is being implemented in Jeddah, Saudi Arabia by South
Jeddah Noor PV Energy Company. The electricity generated from Project Activity is exported to the
Saudi national grid there by displacing the consumption of electricity from the regional grid electricity
distribution system.
The electricity generated by the project “300 MW Thar Solar Project in Jeddah will thus replace the
equivalent amount of electricity generated by the operation of grid-connected power plants and by the
addition of new generation sources into the grid. In this scope, the project owner planned to install Solar
Panels in with the purpose of contributing to the national economy. The estimated annual average
electricity generation by the project activity is 932,306 MWh.
The crediting period chosen for the project activity “300 MW Thar Solar Project in Jeddah is 10 years
Crediting Period in which total GHG emission reduction estimated is 5,295,500 tCO2e. The annual
average estimated emission reductions from project activity is 529,550 tCO2e/annum.