PROJECT DETAILS

Project Submission No. S01231
Project Title Solar Project by Ipca Laboratories Ltd
Project Owner(s) (as per PSF & LOA) EKI Energy Services Limited (Act as project owner), Ipca Laboratories Limited
Submission Date 2023-12-08
Global Stakeholder Consultation Period 2024-05-07 to
2024-05-21
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Solar Power
GCC/CDM Methodology & Version AM0123: Renewable energy generation for captive use --- Version 1.0
Forecasted GHG Emission Reduction (tCO2e/Year) 39,757
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Silver
Forecasted Market Eligibility C+ - Pilot Phase
Location Details Open Full Map
Country
 India
Focal Point of Project Owners
EKI Energy Services Limited
Email of Contact Person of FP (Primary) manish@enkingint.org
Email of Contact Person of FP (Secondary) naveen@enkingint.org
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

The propose project activity is the installation of a new grid-connected 28 MWDC and Solar power plant/unit at the site where no renewable power plant was operating prior to the implementation of the project activity (green-field plant14). The project activity is solar power project which is being implemented in, Village Fefari Sarkar, Tehsil- Khalwa, District – Khandwa, Madhya Pradesh by Ipca Laboratories Limited.

As the project activity complies to the definition of a Greenfield power plant, therefore the baseline scenario as per paragraph 22 of Section 5.2.1 of applied methodology is “electricity delivered to the grid by the project activity would have otherwise been generated by the operation of grid-connected power plants and by the addition of new generation sources”, as described in the combined margin (CM) calculations described in “TOOL07: Tool to calculate the emission factor for an electricity system”.

Additional Information

The estimated emission reductions for the project activity is 39,757 tCO2e.