| Project Submission No. | S01231 |
|---|---|
| Project Title | Solar Project by Ipca Laboratories Ltd |
| Project Owner(s) (as per PSF & LOA) | EKI Energy Services Limited (Act as project owner), Ipca Laboratories Limited |
| Submission Date | 2023-12-08 |
| Global Stakeholder Consultation Period |
2024-05-07 to 2024-05-21 |
| Sector | 1.Energy industries (renewable-/non-renewable sources) |
| Project Type | Solar Power |
| GCC/CDM Methodology & Version | AM0123: Renewable energy generation for captive use --- Version 1.0 |
| Forecasted GHG Emission Reduction (tCO2e/Year) |
|
| Forecasted E+ Label | Yes |
| Forecasted S+ Label | Yes |
| Forecasted SDG+ Goals |
|
| Forecasted SDG+ Label | Silver |
| Forecasted Market Eligibility | C+ - Pilot Phase |
|
Location Details
Open Full Map
|
|
| Country |
India
|
|---|---|
|
Focal Point of Project Owners
|
EKI Energy Services Limited |
| Email of Contact Person of FP (Primary) | manish@enkingint.org |
| Email of Contact Person of FP (Secondary) | naveen@enkingint.org |
| Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
| Project Brief | The propose project activity is the installation of a new grid-connected 28 MWDC and Solar power plant/unit at the site where no renewable power plant was operating prior to the implementation of the project activity (green-field plant14). The project activity is solar power project which is being implemented in, Village Fefari Sarkar, Tehsil- Khalwa, District – Khandwa, Madhya Pradesh by Ipca Laboratories Limited. As the project activity complies to the definition of a Greenfield power plant, therefore the baseline scenario as per paragraph 22 of Section 5.2.1 of applied methodology is “electricity delivered to the grid by the project activity would have otherwise been generated by the operation of grid-connected power plants and by the addition of new generation sources”, as described in the combined margin (CM) calculations described in “TOOL07: Tool to calculate the emission factor for an electricity system”. |
|---|---|
| Additional Information | The estimated emission reductions for the project activity is 39,757 tCO2e. |