| Project Submission No. | S01073 |
|---|---|
| Project Title | 180 MW Solar Energy Project in Mesanka, Gujarat |
| Project Owner(s) (as per PSF & LOA) | Tata Power Renewable Energy Limited |
| Submission Date | 2023-10-19 |
| Global Stakeholder Consultation Period |
2023-11-02 to 2023-11-16 |
| Registration Date | 2026-02-02 |
| Sector | 1.Energy industries (renewable-/non-renewable sources) |
| Project Type | Solar Power |
| GCC/CDM Methodology & Version | ACM0002- Grid-connected electricity generation from renewable sources, Version -21 |
| Forecasted GHG Emission Reduction (tCO2e/Year) |
|
| Verified GHG Emission Reduction (tCO2e/Year) |
|
| Forecasted E+ Label | Yes |
| Verified E+ Label | Yes |
| Forecasted S+ Label | Yes |
| Verified S+ Label | Yes |
| Forecasted SDG+ Goals |
|
| Verified SDG+ Goals |
|
| Forecasted SDG+ Label | Silver |
| Verified SDG+ Label | Silver |
| Forecasted Market Eligibility | |
| Verified Market Eligibility |
|
Location Details
Open Full Map
|
|
| Country |
India
|
|---|---|
|
Focal Point of Project Owners
|
Tata Power Renewable Energy Limited |
| Email of Contact Person of FP (Primary) | sivanarayana@tatapower.com |
| Email of Contact Person of FP (Secondary) | prashant.tiwari@tatapower.com |
| Project Verifier | LGAI TECHNOLOGICAL CENTER, S.A. |
| Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
| Request For Registration Documents | Verified Project Submision
Verified Calculation Sheet Other Verified Documents |
| Request for Registration Form | Registration Form |
| Project Brief | The purposed bundled project activity is the installation of a new grid-connected 180 MW Solar power plant/unit at a site where no renewable power plant was operating prior to the implementation of the project activity (green-field plant). The project activity is solar power project which is being implemented at Mesanka village, Bhavnagar district, in the state of Gujarat, in India by TATA Power Renewable Energy Limited. The electricity generated from Project Activity is exported to the Indian grid thereby displacing the consumption of electricity from the regional grid electricity distribution system, in the absence of the project activity.
|
|---|---|
| Additional Information | The project activity replaces anthropogenic emissions of greenhouse gases (GHG’s) estimated to be a total of 3,890,243 tCO2e over the total 10 years crediting period or average 389,024 tCO2e/annum, thereon displacing 4,178,466 MWh amount of electricity over the 10-year crediting period or annual average electricity generation over the fixed crediting period of 10 years is 417,845 MWh/year amount of electricity from the generation-mix of power plants connected to the Indian electricity grid, which is mainly dominated by thermal/ fossil fuel-based power plant. |
| Report (Public) | Verification Report (public) |
|---|---|
| Verification report date | 2025-12-04 |
| First Request for Registration Date | 2024-01-25 |
| Opinion | LGAI Technological Center S.A. (Applus+ Certification) has performed a verification of the “180 MW Solar Energy Project in Mesanka, Gujarat”. The verification is performed on the basis of GCC criteria project verification standard, Version 3.1 for the project activity, GCC guideline and host country criteria, as well as criteria given to provide for consistent project operations, monitoring and reporting. |