PROJECT DETAILS

Project Submission No. S00134
Project Title YUREGIR BIOMASS PLANT
Project Owner (as per PSF & LOA) • GTE KARBON SÜRDÜRÜLEBİLİR ENERJİ EĞİTİM DAN VE TIC A.S (GTE) • FBY Enerji Üretim Anonim Şirketi (FBY) • OMP Enerji Üretim Anonim Şirketi (OMP)
Focal Point of Project Owners*(FP)
GTE KARBON SÜRDÜRÜLEBİLİR ENERJİ EĞİTİM DAN VE TIC A.S
Email of Contact Person of FP (Primary) kemal.demirkol@gte.com.tr
Email of Contact Person of FP (Secondary) kemal.demirkol@gte.com.tr
Country Turkey
Submission Date 14 Feb 2022
Global Stakeholder Consultation Period 23 Mar 2022 - 6 Apr 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version ACM0018
Forecasted GHG Emission Reduction(TCO2/Year) 77,419
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals 7, 8, 9 and 12
Forecasted SDG+ Label Platinum
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization
Name of Focal Point of External Representative
Email-id of Focal Point
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet, Other Documents
Project Brief

YUREGIR Biomass plant is a bundled biomass project located in Adana, Turkey. The project aims to contribute to reducing environmental pollution from biomass residues and use those wastes for electricity generation. Agricultural residues is a major problem for Adana due to high agricultural and insufficient waste abatement facility.  Valorization of agricultural waste such as cotton, corn, pruning wastes from trees etc.

 

Wastes collected from the region will be baled, transported to the project site to physical processing (drying, crushed into smaller pieces(if needed) and fed to the power plant as fuel. Electricity generated will be fed to the national grid.