| Project Submission No. | S01107 |
|---|---|
| Project Title | Xeset 3 |
| Project Owner(s) (as per PSF & LOA) | (1) EDL-Generation Public Company and (2) B.B. ENERGY (ASIA) PTE LTD |
| Submission Date | 2023-10-12 |
| Global Stakeholder Consultation Period |
2023-12-31 to 2024-01-14 |
| Sector | 1.Energy industries (renewable-/non-renewable sources) |
| Project Type | Hydro Power |
| GCC/CDM Methodology & Version | ACM0002.: Grid-connected electricity generation from renewable sources, Version 22.0 |
| Forecasted GHG Emission Reduction (tCO2e/Year) |
|
| Forecasted E+ Label | Yes |
| Forecasted S+ Label | Yes |
| Forecasted SDG+ Goals |
|
| Forecasted SDG+ Label | Silver |
| Forecasted Market Eligibility | C+ - Pilot Phase |
|
Location Details
Open Full Map
|
|
| Country |
Lao People's Democratic Republic
|
|---|---|
|
Focal Point of Project Owners
|
B.B. ENERGY (ASIA) PTE LTD |
| Email of Contact Person of FP (Primary) | opsforcarbon@bbenergy.com |
| Email of Contact Person of FP (Secondary) | carbonops@bbenergy.com |
| Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
| Project Brief | The proposed Xeset 3 Project identified and developed by Electricite Du Laos located on Xeset river in Laongam district, Saravan province of Laos PDR. The Xeset river is a branch of Xedon river, which is tributary of Mekong river. The nominal installed capacity of the project is 23 MW (two units with capacity of 5 MW and 18 MW are installed ), with estimated annual power generation 86.10 GWh. The net generated electricity from the project activity will be supplied to the regional grid consisting of Thailand power grid and the Lao power grid. The purpose of the project activity is to produce renewable energy using hydro power for supplying to grid. In the absence of the project activity, equivalent amount of electricity would have been generated by the operation of grid connected fossil fuel-based power plants. The Project activity, thus, reduces the anthropogenic emissions of greenhouse gases (GHGs) in to the atmosphere associated with the equivalent amount of electricity generation from the fossil fuel-based grid connected power plant. The project is commissioned dated 07/07/2017 and is operational since then. The estimated annual average and the total CO2e emission reduction by the project activity over the crediting period of 10 years are expected to be 47,742 tCO2e and 477,420 tCO2e respectively. |
|---|