PROJECT DETAILS

Project Submission No. S01107
Project Title Xeset 3
Project Owner(s) (as per PSF & LOA) (1) EDL-Generation Public Company and (2) B.B. ENERGY (ASIA) PTE LTD
Submission Date 2023-10-12
Global Stakeholder Consultation Period 2023-12-31 to
2024-01-14
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Hydro Power
GCC/CDM Methodology & Version ACM0002.: Grid-connected electricity generation from renewable sources, Version 22.0
Forecasted GHG Emission Reduction (tCO2e/Year) 47,742
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Silver
Forecasted Market Eligibility C+ - Pilot Phase
Location Details Open Full Map
Country
 Lao People's Democratic Republic
Focal Point of Project Owners
B.B. ENERGY (ASIA) PTE LTD
Email of Contact Person of FP (Primary) opsforcarbon@bbenergy.com
Email of Contact Person of FP (Secondary) carbonops@bbenergy.com
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

The proposed Xeset 3 Project identified and developed by Electricite Du Laos  located on Xeset river in Laongam district, Saravan province of Laos PDR. The Xeset river is a branch of Xedon river, which is tributary of Mekong river.

The nominal installed capacity of the project is 23 MW (two units with capacity of 5 MW and 18 MW are installed ), with estimated annual power generation 86.10 GWh. The net generated electricity from the project activity will be supplied to the regional grid consisting of Thailand power grid and the Lao power grid.

The purpose of the project activity is to produce renewable energy using hydro power for supplying to grid. In the absence of the project activity, equivalent amount of electricity would have been generated by the operation of grid connected fossil fuel-based power plants. The Project activity, thus, reduces the anthropogenic emissions of greenhouse gases (GHGs) in to the atmosphere associated with the equivalent amount of electricity generation from the fossil fuel-based grid connected power plant. The project is commissioned dated 07/07/2017 and is operational since then.

The estimated annual average and the total CO2e emission reduction by the project activity over the crediting period of 10 years are expected to be 47,742 tCO2e and 477,420 tCO2e respectively.