| Project Submission No. | S01064 |
|---|---|
| Project Title | Benban Solar Park Bundled Project 6 |
| Project Owner(s) (as per PSF & LOA) | Ra Solar S.A.E;. Winnergy for Renewable Energy Project; ARC for Renewable Energy S.A.E; First Climate (Switzerland) AG |
| Submission Date | 2023-09-11 |
| Global Stakeholder Consultation Period |
2023-10-18 to 2023-11-01 |
| Sector | 1.Energy industries (renewable-/non-renewable sources) |
| Project Type | Solar Power |
| GCC/CDM Methodology & Version | GCCM001-v4.0 |
| Forecasted GHG Emission Reduction (tCO2e/Year) |
|
| Forecasted E+ Label | Yes |
| Forecasted S+ Label | Yes |
| Forecasted SDG+ Goals |
|
| Forecasted SDG+ Label | Silver |
| Forecasted Market Eligibility | C+ - Pilot Phase |
|
Location Details
Open Full Map
|
|
| Country |
Egypt
|
|---|---|
|
Focal Point of Project Owners
|
First Climate (Switzerland) AG |
| Email of Contact Person of FP (Primary) | focalpoint@firstclimate.com |
| Email of Contact Person of FP (Secondary) | yves.keller@firstclimate.com |
| Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
| Project Brief | The proposed project (Benban Solar Park Bundled Project 6) represents the Bundled Project consisting of three Photovoltaic (PV) plants (“Activities”) of different capacities, located in Benban region (Egypt) and operated by different project owners (legal owners). The Project Activities are part of the Benban Solar Park, currently consisting of 41 different PV plants with the total installed capacity of 1,650 MWh. The total capacity of the proposed Bundled Project is 95 MW. Each Activity under the Bundled Project is a PV Plant utilizing solar energy via the photovoltaic panels for production of renewable electricity and feeding it into the national power grid of Egypt. In the absence of the proposed Bundled Project, the electricity delivered to the grid by the PV Plants of the proposed Bundled Project would have been produced by the operation of grid-connected power plants and by the addition of new generation sources to the national power grid. |
|---|