PROJECT DETAILS

Project Submission No. S00129
Project Title Kovanlık Reg. ve HES
Project Owner (as per PSF & LOA) Kovanlık Enerji Üretim San. ve Tic. A.Ş.
Focal Point of Project Owners*(FP)
GTE KARBON SÜRDÜRÜLEBİLİR ENERJİ EĞİTİM DAN VE TIC A.S
Email of Contact Person of FP (Primary) kemal.demirkol@gte.com.tr
Email of Contact Person of FP (Secondary) arda.bayindir@kovanlikenerji.com.tr
Country Türkiye
Submission Date 14 Feb 2022
Global Stakeholder Consultation Period 10 Mar 2022 - 24 Mar 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version ACM0002 “Consolidated methodology for grid-connected electricity generation from renewable sources”, Version - 20
Forecasted GHG Emission Reduction(TCO2/Year) 87,947 tCO2eq
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals 7, 8, 9, and 13
Forecasted SDG+ Label Gold
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization GTE KARBON SÜRDÜRÜLEBİLİR ENERJİ EĞİTİM DANIŞMANLIK VE TİC. A.Ş
Name of Focal Point of External Representative M. Kemal Demirkol
Email-id of Focal Point kemal.demirkol@gte.com.tr
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet, Other Documents
Project Brief

Kovanlık Regulator and Hydro Power Plant has been developed by Kovanlık Enerji Üretim San.ve Tic. A.Ş.. The project aim is to contribute to reducing national energy deficit and development of local industries as it allows the use of cheaper energy for industrialists and gain advantage in a competitive environment.

The purpose of the project is to generate clean energy by using the hydro power and providing the energy to the Turkish national grid. By implementing the project, investors also aim to reduce dependency to the fossil fuels thereby reducing the sources of environmental pollution. In this scope, Kovanlık Enerji Üretim San.ve Tic. A.Ş. planned to establish a channel type hydropower plant in Bulancak district of Giresun province with the purpose of contributing to the national economy the meeting the increased electricity demand. The project boundary is considered as the National Electricity Grid of Türkiye according to applied tool. The baseline scenario refers to the energy generation from the fossil fuels.
The project consists of 3 units each having 19.461 MWm / 19.07167 MWe. The total installed capacity is 58.383 MWm / 57.215 MWe. Annual electricity production is expected to be 154.13 GWh. The project is licenced on 26/07/2018. As per the license issued by Energy Market Regulatory Authority (EMRA) all legal rights of the project is given to Kovanlık Enerji Üretim San.ve Tic. A.Ş for 49 years.

Additional Information