Project Submission No. S01207
Project Title Rio do Peixe Solar Complex by Energisa
Project Owner(s) (as per PSF & LOA) Energisa Comercializadora de Energia LTDA. & Energisa Geração Central Solar Rio do Peixe I
Submission Date 2023-08-18
Global Stakeholder Consultation Period 2024-04-16 to
2024-04-30
Registration Date 2026-08-20
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Solar Power
GCC/CDM Methodology & Version ACM0002: Grid-connected electricity generation from renewable sources - Version 22.0
Forecasted GHG Emission Reduction (tCO2e/Year) 47,902
Verified GHG Emission Reduction (tCO2e/Year) 47,902
Forecasted E+ Label Yes
Verified E+ Label Yes
Forecasted S+ Label Yes
Verified S+ Label Yes
Forecasted SDG+ Goals
Verified SDG+ Goals
Forecasted SDG+ Label Silver
Verified SDG+ Label Silver
Forecasted Market Eligibility
Verified Market Eligibility
Location Details Open Full Map
Country
 Brazil
Focal Point of Project Owners
Energisa Comercializadora de Energia LTDA.
Email of Contact Person of FP (Primary) focal.point@energisa.com.br
Email of Contact Person of FP (Secondary) focal.point@energisa.com.br
Email-id of External representative focal.point@energisa.com.br
Project Verifier Carbon Check (India) Private Limited
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Request For Registration Documents Verified Project Submision
Verified Calculation Sheet

Other Verified Documents
Request for Registration Form Registration Form
Project Brief

Rio do Peixe Solar Complex by Energisa (the “Project Activity” or “Project”) is a Greenfield solar generation complex installed by the Energisa Group, hereby referred to as “Energisa”, and consists of two solar photovoltaic units (Central Geradora Fotovoltaica – UFV in Portuguese) with an installed capacity of 34.37 MW each and a combined installed capacity of 68.74 MW, located in the municipality of São João do Rio do Peixe, Paraíba state, Northeast of Brazil. The purpose of the project activity is to reduce GHG emissions, deliver clean, reliable and renewable energy with minimum environmental impact, and boost local economic development through the creation of jobs.

VERIFICATION OUTCOME
Report (Public) Verification Report (public)
Verification report date 2026-06-23
First Request for Registration Date 2024-03-08
Opinion

Carbon Check was contracted by “Energisa Comercializadora de Energia LDTA” and “Energisa Geração Central Solar Rio do Peixe I S.A” for project verification on 04/06/2024 /46/ for the project activity “Rio do Peixe Solar Complex by Energisa”. The project verification was performed based on rules and requirements defined by GCC for the project activity.

The project activity is a solar power project, which results in reductions of CO2e emissions that are real, measurable and give long-term benefits to the mitigation of climate change. It is demonstrated that the project is not a likely baseline scenario and the emission reductions attributable to the project are, hence, additional to any that would occur in the absence of the project activity. The project correctly applies the CDM approved baseline and monitoring methodology ACM0002 Grid-connected electricity generation from renewable sources, Version 22.0 /B02/ and is assessed against latest valid GCC Project Standard /B01-1/, GCC Verification Standard /B01-2/ and Environment and Social Safeguards Standard /B01-4/, Project-Sustainability-Standard /B01-5/ and/or other applicable GCC/CDM Decisions/Tools/Guidance/Forms.

The project activity is likely to achieve the anticipated emission reductions stated in the PSF provided the underlying assumptions do not change. The expected emission reductions (annual average) from the project activity are estimated to be 47,902 tCO2e/year over the 10 years crediting period.

Carbon Check has informed the project owners of the project verification outcome through the draft project verification report and final project verification report. The final project verification report contains the information with regard to fulfilment of the requirements for project verification, as appropriate.

Carbon Check applied the following verification process and methodology using a competent verification team;

·       The desk review of documents and evidence submitted by the project owner in context of the reference GCC rules and guidelines issued,

·       Undertaking/conducting site visit, interview, or interactions with the representative of the project owners.

·       Reporting audit findings with respect to clarifications and non-conformities and the closure of the findings, as appropriate

·       Preparing a draft verification opinion based on the audit findings and conclusions.

·       Technical review of the final project verification opinion along with other documents as appropriate by an independent competent technical review team.

·       Finalization of the project verification opinion (this report)

Subject to closure of all the raised findings in Appendix 4 of this report, the GCC Project Verifier, Carbon Check (India) Private Ltd, verifies and certifies that the GCC Project Activity “Rio do Peixe Solar Complex by Energisa”:

a)    has correctly described the Project Activities in the Project Submission Form (Version 7.0, dated 27/04/2026) including the applicability of the approved CDM methodology, ACM0002, version 22.0 /B02/ and meets the methodology applicability conditions, is additional and is expected to achieve the forecasted real, measurable and additional GHG emission reductions, complies with the monitoring methodology, has appropriately conducted local and global stakeholder consultation processes and has calculated emission reduction estimates correctly and conservatively;

b)    is likely to generate  annual average of 162,103 MWh/year of electricity (for the fixed 10 years crediting period), as indicated in the PSF version 6.0 /01/, which are generated from existing baseline scenario of the national grid of Brazil in the absence of the Project Activity and complies with all applicable GCC rules, including ISO 14064-2 and ISO 14064-3, and therefore requests the GCC Program to register the Project Activity.

c)    is not likely to cause any net-harm to the environment and/or society and complies with the Environmental and Social Safeguards Standard, and therefore requests the GCC Program to register the Project Activity, which is likely to achieve the requirements of the Environmental No-net-harm Label (E+) and the Social No-net harm Label (S+); and

d)    is likely to contribute to the achievement of United Nations Sustainable Development Goals (SDGs), comply with the Project Sustainability Standard, and contribute to achieving a total of 3 SDGs, which is likely to achieve the silver SDG certification label (SDG+).

e)    is not eligible for CORSIA (C+) label as per the latest decision of the ICAO Council on “CORSIA Eligible Emissions Units” from GCC Program for CORSIA First Phase (2024 – 2026 compliance period). This is because the project activity is of large scale (more than 15 MW) and it is of type A3. Therefore, it is not eligible for CORSIA (C+) label for pilot phase nor first phase.

The project verification report describes a total of 23 findings, which include:

• 13 Corrective Action Requests (CARs);

• 10 Clarification Requests (CLs);

• 00 Further Action Required (FARs);

All CARs and CLs are resolved by the project owner.