PROJECT DETAILS

Project Submission No. S01046
Project Title Umutlu HEPP
Project Owner(s) (as per PSF & LOA) -GA Elektrik Enerjisik Üretim Satış Sanayi ve Ticaret A.Ş. -GTE KARBON SÜRDÜRÜLEBİLİR ENERJİ EĞİTİM DANIŞMANLIK VE TİCARET A.Ş.
Submission Date 2023-06-22
Global Stakeholder Consultation Period 2023-10-01 to
2023-10-15
Registration Date 2026-07-09
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Hydro Power
GCC/CDM Methodology & Version ACM0002 “Grid-connected electricity generation from renewable sources”, Version 21.0
Forecasted GHG Emission Reduction (tCO2e/Year) 43,816
Verified GHG Emission Reduction (tCO2e/Year) 43,816
Forecasted E+ Label Yes
Verified E+ Label Yes
Forecasted S+ Label Yes
Verified S+ Label Yes
Forecasted SDG+ Goals
Verified SDG+ Goals
Forecasted SDG+ Label Silver
Verified SDG+ Label Silver
Forecasted Market Eligibility C+ - Pilot Phase
Verified Market Eligibility C+ - Pilot Phase
Location Details Open Full Map
Country
 Türkiye
Focal Point of Project Owners
GTE KARBON SÜRDÜRÜLEBİLİR ENERJİ EĞİTİM DAN VE TIC A.S
Email of Contact Person of FP (Primary) kemal.demirkol@gte.com.tr
Email of Contact Person of FP (Secondary) beste.dingil@gte.com.tr
Name of Authorized External Representative Organization -
Name of Focal Point of External Representative -
Email-id of External representative kemal.demirkol@gte.com.tr
Project Verifier Carbon Check (India) Private Limited
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Request For Registration Documents Verified Project Submision
Verified Calculation Sheet

Other Verified Documents
Request for Registration Form Registration Form
Project Brief

Umutlu HEPP which is a run of river type project on the Yeşilırmak River in Taşova district in Amasya Province, has been developed by GA Elektrik Enerjisi Üretim Satış Sanayi ve Ticaret A.Ş. The project aims to contribute to reducing national energy deficit and development of local industries as it allows the use of cheaper energy for industrialists and gain advantage in a competitive environment. GA Elektrik Enerjisi Üretim Satış Sanayi ve Ticaret A.Ş. has the legal ownership of the ACCs generated by this project activity as per LoA.

VERIFICATION OUTCOME
Report (Public) Verification Report (public)
Verification report date 2026-06-08
First Request for Registration Date 2024-05-03
Opinion

Carbon Check was contracted by GA ELEKTRIK ENERJISI ÜRETIM SATIŞ SANAYI VE TICARET A.Ş.for project verification of the project activity “UMUTLU HEPP” in Türkiye. The project verification was performed based on rules and requirements defined by GCC for the project activity. The project activity is a hydro power project, which results in reductions of CO2e emissions that are real, measurable and give long-term benefits to the mitigation of climate change. It is demonstrated that the project is not a likely baseline scenario and the emission reductions attributable to the project are, hence, additional to any that would occur in the absence of the project activity. The project correctly applies the approved baseline and monitoring ACM0002 version 21.0 and is assessed against latest valid PS, VS and Environment and Social Safeguards Standard, Project-Sustainability-Standard and/or
other applicable GCC/CDM Decisions/Tools/Guidance/Forms.
The project activity is likely to achieve the anticipated emission reductions stated in the PSF provided the underlying assumptions do not change. The expected emission reductions (annual average) from the project activity are estimated to be 43,816 tCO2e/year and 438,160 tonnes of CO2 over the 10 years crediting period starting from 08/04/2016.
Carbon Check has informed the project owners of the project verification outcome through the draft project verification report and final project verification report. The final project verification report contains the information with regard to fulfilment of the requirements for project verification, as appropriate.
Carbon Check applied the following verification process and methodology using a competent verification team;
• the desk review of documents and evidence submitted by the project owner in context of the reference GCC rules and guidelines issued,
• undertaking/conducting site visit, interview, or interactions with the representative of the project owner,
• reporting audit findings with respect to clarifications and non-conformities and the closure of the findings, as appropriate
• preparing a draft verification opinion based on the auditing findings and conclusions
• technical review of the draft project verification opinion along with other documents as appropriate by an independent competent technical review team
• finalization of the project verification opinion (this report)
Carbon Check (India) Private Limited (Carbon Check) has verified and hereby certifies that the GCC project activity “UMUTLU HEPP”
a. has correctly described the Project Activity in the Project Submission Form including the applicability of the approved methodology ACM0002 Version 21.0 and meets the methodology
applicability conditions, is additional and is expected to achieve the forecasted real and additional GHG emission reductions, complies with the monitoring methodology, has
appropriately conducted local and global stakeholder consultation processes and has calculated emission reduction estimates correctly and conservatively;
b. is likely to generate GHG emission reductions amounting to the estimated 43,816 tCO2e per year as indicated in the PSF, which are additional to the reductions that are likely to occur in
absence of the Project Activity and complies with all applicable GCC rules, including ISO 14064-2 and ISO 14064-3, and therefore requests the GCC Program to register the Project Activity;
c. is not likely to cause any net-harm to the environment and/or society and complies with theEnvironmental and Social Safeguards Standard, and therefore requests the GCC Program to
register the Project Activity, which is likely to achieve the requirements of the Environmental No- net-harm Label (E+) and the Social No-net-harm Label (S+); and
d. is likely to contribute to the achievement of United Nations Sustainable Development Goals (SDGs), comply with the Project Sustainability Standard, and contribute to achieving a total of
3 SDGs, which is likely to achieve the Silver SDG certification label (SDG+)

The project does not meet the requirements of the CORSIA Eligible Emissions Units required for GCC projects. The start date of the crediting period is 08/04/2016, which is after the date of 1 January 2016. However, since the installed capacity of the project activity is higher than 15 MWe (20.34 MWe as per the generation license), the PO does not intend to use for CORSIA. And the project is likely to:
(a) reduce a forecasted quantity of greenhouse gases (ACC label);
(b) achieve Environmental No-Net Harm (E+ label);
(c) achieve Social No-Net Harm (S+ label); and
(d) achieve United Nations Sustainable Development Goals (Silver SDG+ label).
Hence, the project is being recommended to GCC Steering Committee for request for registration.

 