PROJECT DETAILS

Project Submission No. S01049
Project Title Ventos de Sao Vitor Wind Farm
Project Owner(s) (as per PSF & LOA) EKI Energy Services Limited
Submission Date 2023-04-17
Global Stakeholder Consultation Period 2023-10-08 to
2023-10-22
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Wind Power
GCC/CDM Methodology & Version GCCM001- Grid Connected Renewable Energy Generation Projects (Version No. – V3.0)
Forecasted GHG Emission Reduction (tCO2e/Year) 587,991
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Diamond
Forecasted Market Eligibility C+ - Pilot Phase
Location Details Open Full Map
Country
 Brazil
Focal Point of Project Owners
EKI Energy Services Limited
Email of Contact Person of FP (Primary) manish@enkingint.org
Email of Contact Person of FP (Secondary) naveen@enkingint.org
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

The project activity involves the development of a wind power facility comprising an installed capacity of 465 MW, by the installation of 75 x 6.2MW SG6.2, at a site where no renewable power plant was operating prior to the implementation of the project activity (greenfield project).
The facility will be connected to the Brazilian grid through the Brazilian National Interconnected System (Sistema Eléctrico Nacional, SIN) and will displace electricity from the grid electricity distribution system generated by fossil fueled power plants. The electricity generated by the Project Activity thus replaces the equivalent amount of electricity generated by the operation of existing/ grid connected power plants and by addition of new generation sources into the grid. The Project Activity thus reduces the anthropogenic emissions of greenhouse gases (GHGs) in to the atmosphere associated with the equivalent amount of electricity generation from the existing grid connected power plants (mostly fossil fuel) and by addition of new generation sources into the grid.

Additional Information

The annaul estimated emission reductions for the project activity are 587991 tCO2e.