| Project Submission No. | S01011 |
|---|---|
| Project Title | Xinjiang Wuqia Xiate Hydro Power Plant Project |
| Project Owner(s) (as per PSF & LOA) | Xinjiang Neutrino Carbon Investment Technology Co., Ltd |
| Submission Date | 2023-03-10 |
| Global Stakeholder Consultation Period |
2023-07-09 to 2023-07-23 |
| Registration Date | 2024-12-10 |
| Sector | 1.Energy industries (renewable-/non-renewable sources) |
| Project Type | Hydro Power |
| GCC/CDM Methodology & Version | ACM0002: Grid-connected electricity generation from renewable sources - Version 21.0 |
| Forecasted GHG Emission Reduction (tCO2e/Year) |
|
| Verified GHG Emission Reduction (tCO2e/Year) |
|
| Forecasted E+ Label | Yes |
| Verified E+ Label | Yes |
| Forecasted S+ Label | Yes |
| Verified S+ Label | Yes |
| Forecasted SDG+ Goals |
|
| Verified SDG+ Goals |
|
| Forecasted SDG+ Label | Silver |
| Verified SDG+ Label | Silver |
| Forecasted Market Eligibility | |
| Verified Market Eligibility |
|
Location Details
Open Full Map
|
|
| Country |
China
|
|---|---|
|
Focal Point of Project Owners
|
Xinjiang Neutrino Carbon Investment Technology Co., Ltd |
| Email of Contact Person of FP (Primary) | 52150913@qq.com |
| Email of Contact Person of FP (Secondary) | 442088543@qq.com |
| Project Verifier | CTI Certification Co., Ltd |
| Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
| Request For Registration Documents | Verified Project Submision
Verified Calculation Sheet Other Verified Documents |
| Request for Registration Form | Registration Form |
| Project Brief | Xinjiang Wuqia Xiate Hydro Power Plant Project is located in Wuheshalu Township, Wuqia County , Keerkezi Autonomous Prefecture, Xinjiang.The total installed capacity is 248 MW. It is expected that total 6,598,800 tCO2e will be reduced over the crediting period. |
|---|
| Report (Public) | Verification Report (public) |
|---|---|
| Verification report date | 2024-11-01 |
| First Request for Registration Date | 2023-09-07 |
| Opinion | CTI Certification Co., Ltd (CTI) has verified and hereby certifies that the GCC project activity “Xinjiang Neutrino Carbon Investment Technology Co., Ltd”: a. has correctly described the Project Activity in the Project Submission Form (Version 4.5, dated 01/11/2024) including the applicability of the approved methodology ACM0002 “Grid-connected electricity generation from renewable sources”, version 21.0 and meets the methodology applicability conditions, is additional and is expected to achieve the forecasted real, measurable and additional GHG emission reductions, complies with the monitoring methodology, has appropriately conducted local and global stakeholder consultation processes and has calculated emission reduction estimates correctly and conservatively; b. is likely to generate GHG emission reductions amounting to the estimated 659,880 tCO2e per year as indicated in the PSF, which are additional to the reductions that are likely to occur in absence of the Project Activity and complies with all applicable GCC rules, including ISO 14064-2 and ISO 14064-3, and therefore requests the GCC Program to register the Project Activity; c. is not likely to cause any net-harm to the environment and/or society and complies with the Environmental and Social Safeguards Standard, and therefore requests the GCC Program to register the Project Activity, which is likely to achieve the requirements of the Environmental No-net-harm Label (E+) and the Social No-net-harm Label (S+); and
|