Project Submission No. | S00863 |
---|---|
Project Title | Campos dos Ventos e São Benedito Complex |
Project Owner (as per PSF & LOA) | CPFL Energias Renováveis S.A. |
Focal Point of Project Owners*(FP)
|
Jorge Nehmi Junior |
Email of Contact Person of FP (Primary) | jorgenehmi@cpfl.com.br |
Email of Contact Person of FP (Secondary) | lucaszajd@cpfl.com.br |
Country | Brazil |
Submission Date | 4 Jul 2022 |
Global Stakeholder Consultation Period | 6 Feb 2023 - 20 Feb 2023 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
GCC/CDM Methodology & Version | ACM0002 – Grid-connected electricity generation from renewable sources V21.0 |
Forecasted GHG Emission Reduction(TCO2/Year) | 561,523 |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
---|---|
Forecasted SDG+ Goals | 1, 7, 8, 9, 10, 11 |
Forecasted SDG+ Label | Diamond |
Forecasted Market Eligibility | CORSIA(C+) |
Name of Authorized External Representative Organization | |
Name of Focal Point of External Representative | |
Email-id of Focal Point | jorgenehmi@cpfl.com.br |
Documents for Global Stakeholder Consultation | Project Submision, Calculation Sheet, Other Documents |
Project Brief | The proposed project activity consists in the implementation and operation of nine new wind electricity generation facilities, Campo dos Ventos I, III and V, Ventos de São Benedito, Ventos de Santo Dimas, Ventos de São Domingos, Ventos de São Martinho, Ventos de Santa Mônica and Ventos de Santa Úrsula, , located in the municipality of João Camara, in the Rio Grande do Norte state, in Brazil. The project activity will employ 110 horizontal-axis aerogenerators. The physical implementation of the project activity started on 04/05/2016, date of the first dispatch of National Interconnected System (Sistema Interligado Nacional – SIN). The project activity will deliver 1,446,400 MWh/year of renewable electricity to the National Interconnected System (Sistema Interligado Nacional - SIN). In the baseline scenario, electricity delivered to the grid by the project activity would have been generated by the operation of grid-connected power plants and by the addition of new generation sources, as reflected in the combined margin (CM) calculations. Hence, the project activity will promote GHG emissions reductions by displacing fossil fuel-based electricity generation that would otherwise occur. |
---|---|
Additional Information |