| Project Submission No. | S00272 |
|---|---|
| Project Title | Kürekdağı WPP |
| Project Owner(s) (as per PSF & LOA) | -Bakır Enerji Elektrik Üretim A.Ş. -GTE KARBON SÜRDÜRÜLEBİLİR ENERJİ EĞİTİM DANIŞMANLIK VE TİC. A.Ş. |
| Submission Date | 2022-02-10 |
| Global Stakeholder Consultation Period |
2022-07-27 to 2022-08-10 |
| Registration Date | 2026-08-12 |
| Sector | 1.Energy industries (renewable-/non-renewable sources) |
| Project Type | Wind Power |
| GCC/CDM Methodology & Version | ACM0002 “Consolidated methodology for grid-connected electricity generation from renewable sources”, Version - 21 |
| Forecasted GHG Emission Reduction (tCO2e/Year) |
|
| Verified GHG Emission Reduction (tCO2e/Year) |
|
| Forecasted E+ Label | Yes |
| Verified E+ Label | Yes |
| Forecasted S+ Label | Yes |
| Verified S+ Label | Yes |
| Forecasted SDG+ Goals |
|
| Verified SDG+ Goals |
|
| Forecasted SDG+ Label | Silver |
| Verified SDG+ Label | Silver |
| Forecasted Market Eligibility | C+ - Pilot Phase |
| Verified Market Eligibility | C+ - Pilot Phase |
|
Location Details
Open Full Map
|
|
| Country |
Türkiye
|
|---|---|
|
Focal Point of Project Owners
|
GTE KARBON SÜRDÜRÜLEBİLİR ENERJİ EĞİTİM DAN VE TIC A.S |
| Email of Contact Person of FP (Primary) | kemal.demirkol@gte.com.tr |
| Email of Contact Person of FP (Secondary) | ersan.gulay@agaoglu.com.tr |
| Name of Authorized External Representative Organization | GTE KARBON SÜRDÜRÜLEBİLİR ENERJİ EĞİTİM DANIŞMANLIK VE TİC. A.Ş |
| Name of Focal Point of External Representative | M. Kemal Demirkol |
| Email-id of External representative | kemal.demirkol@gte.com.tr |
| Project Verifier | Carbon Check (India) Private Limited |
| Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
| Request For Registration Documents | Verified Project Submision
Verified Calculation Sheet Other Verified Documents |
| Request for Registration Form | Registration Form |
| Project Brief | The project activity is the installation and operation of a wind power project of 32.5 Mwe/ 36 MWm total capacity (10 x 3.25 MWe wind turbines) in Gemlik town, Kürekdağı, Hendekbaşı Tepe, Orta Tepe, Bakamak Tepe, Çakal Tepe district in Bursa Province and in Çınarcık town, Davlumbaz Tepe, Bakacak Tepe, Delibaş Tepe districts in Yalova Province, Türkiye. Kürekdağı WPP has been developed by Bakır Enerji Elektrik Üretim A.Ş. The project aims to contribute to reducing national energy deficit and development of local industries as it allows the use of cheaper energy for industrialists and gain advantage in a competitive environment. The parent company is Ağaoğlu Energy Group. |
|---|
| Report (Public) | Verification Report (public) |
|---|---|
| Verification report date | 2026-06-24 |
| First Request for Registration Date | 2023-07-18 |
| Opinion | Carbon Check was contracted by BAKIR ENERJI ELEKTRIK ÜRETIM A.Ş. for project verification of the project activity “KÜREKDAĞI WPP” in Türkiye dated 30/12/2021. The project verification was performed based on rules and requirements defined by GCC for the project activity. The project activity is a wind power project, which results in reductions of CO2e emissions that are real, measurable and give long-term benefits to the mitigation of climate change. It is demonstrated that the project is not a likely baseline scenario and the emission reductions attributable to the project are, hence, additional to any that would occur in the absence of the project activity. The project correctly applies the approved baseline and monitoring ACM0002 version 21.0 and is assessed against latest valid PS, VS and Environment and Social Safeguards Standard, Project-Sustainability-Standard and/or other applicable GCC/CDM Decisions/Tools/Guidance/Forms. The project activity is likely to achieve the anticipated emission reductions stated in the PSF provided the underlying assumptions do not change. The expected emission reductions (annual average) from the project activity are estimated to be 44,289 tCO2e/year and 442,885 tCO2e over the remaining crediting period starting from 14/10/2017 to 13/07/2027. Project has been previously registered as I-REC and issued certificates for electricity generation between 01/02/2018 to 21/01/2022 /1/ .The project was registered to I-REC since 01/02/2018. However, the account was cancelled on 21/01/2022, during which a total of 326,588 MWh (2018: 37,631 MWh; 2019: 104,176 MWh; 2020: 107,143 MWh; 2021: 77,638 MWh) were issued as certificates /2/. These issued volumes during the IREC registration period (i.e., 326,588 MWh) will not be claimed over under GCC. The registration to IREC has been cancelled prior to submission to GCC and project owner will not claim any IREC in the future. Carbon Check has informed the project owners of the project verification outcome through the draft project verification report and final project verification report. The final project verification report contains information with regard to fulfilment of the requirements for project verification, as appropriate. a. has correctly described the Project Activity in the Project Submission Form including the applicability of the approved methodology ACM0002 Version 21.0 and meets the methodology applicability conditions, is additional and is expected to achieve the forecasted, real , measurable and additional GHG emission reductions, complies with the monitoring methodology, has appropriately conducted local and global stakeholder consultation processes and has calculated emission reduction estimates correctly and conservatively; A certification opinion by Carbon Check endorses that a project is expected to achieve an indicative CORSIA (C+ label) as the project activity complies with the conditions stated in paragraph 21 and 22 of clarification no. 1 of GCC V 1.3 i.e. If GCC Program receives the approval to issue CORSIA eligible units beyond 31 December 2020, the Project owner ensured that there is no double counting for Emission units generated after 31 December 2020. A self-declaration from the Project Owner in the PSF declares that written attestation from the host country’s national focal point or focal point designee will be provided at the earliest opportunity, but prior to submission of requesting issuance to the GCC Program. And project is likely to: (a) reduce the forecasted quantity of greenhouse gases (ACC label); |