PROJECT DETAILS

Project Submission No. S00666
Project Title 30 MW (AC) GRID CONNECTED SOLAR PV PROJECT UNDER SECI BY BHAGERIA INDUSTRIES LIMITED
Project Owner(s) (as per PSF & LOA) BHAGERIA INDUSTRIES LIMITED
Submission Date 2022-07-04
Global Stakeholder Consultation Period 2022-12-05 to
2022-12-19
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Solar Power
GCC/CDM Methodology & Version ACM0002, Version 21.0
Forecasted GHG Emission Reduction (tCO2e/Year) 53,563
Forecasted E+ Label Yes
Verified E+ Label
Forecasted S+ Label Yes
Verified S+ Label
Forecasted SDG+ Goals
Verified SDG+ Goals
Forecasted SDG+ Label Gold
Verified SDG+ Label
Forecasted Market Eligibility C+ - Pilot Phase
Verified Market Eligibility
Country
 India
Focal Point of Project Owners
Bhageria Industries Limited
Email of Contact Person of FP (Primary) vikas.gh@bhageriagroup.com
Email of Contact Person of FP (Secondary) ho.solar@bhageriagroup.com
Name of Authorized External Representative Organization NA
Name of Focal Point of External Representative NA
Email-id of External representative vikas.gh@bhageriagroup.com
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

The main purpose of this project activity is to generate clean form of electricity through renewable solar energy source.
Bhageria Industries Ltd. is the promoter of the proposed project activity which involves installation of 30 MW solar power
project at village- Kombhalne, Tehsil- Akole, District- Ahmednagar, Maharashtra. The solar power project is installed in
the state of Maharashtra in India by Bhageria Industries Ltd, at site where no renewable/solar power plant was operating
prior to the implementation of the project activity (green-field power plant).The electricity generated from solar power
plant is exported to the Indian grid, thus replaces equivalent amount of electricity generated from the operation of
existing grid connected power plants which is mainly dominated by thermal/fossil fuel-based power plant. The project
activity thus reduces the anthropogenic emissions of greenhouse gases (GHGs) associated with equivalent amount of
electricity generation from the existing grid connected power plants (mostly fossil fuel based) and from addition of new generation sources into the grid.