Project Submission No. | S00599 |
---|---|
Project Title | Sichuan Gashe Longdong Hydropower Station |
Project Owner(s) (as per PSF & LOA) | Sichuan Juneng Intelligent Network Energy Tech Co., Ltd. |
Submission Date | 2022-07-03 |
Global Stakeholder Consultation Period |
2022-11-15 to 2022-11-29 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
Project Type | Hydro Power |
GCC/CDM Methodology & Version | ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
Forecasted GHG Emission Reduction (tCO2e/Year) |
![]() |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
Forecasted SDG+ Goals |
![]() ![]() ![]() ![]() |
Forecasted SDG+ Label | Gold |
Forecasted Market Eligibility | C+ - Pilot Phase |
Country |
China
|
---|---|
Focal Point of Project Owners
|
Sichuan Juneng Intelligent Network Energy Tech Co., Ltd |
Email of Contact Person of FP (Primary) | eric.zhou8@hotmail.com |
Email of Contact Person of FP (Secondary) | 18459470@qq.com |
Name of Authorized External Representative Organization | Goldchina Consultancy International Co., Ltd. |
Name of Focal Point of External Representative | Zheng Zhaoning |
Email-id of External representative | zzn@gcci-carbon.com |
Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
Project Brief | The project installed three generators with a total installed capacity of 165MW. The total surface area of the reservoir at full capacity is 37,100m2 and the power density of the project is 4,447W/m2. The electricity supplied to the grid is estimated to be 690,930MWh, corresponding to the annual ACCs of 395,245tCO2e. The total ACCs in the fixed 10 years crediting period is 3,952,450tCO2e. |
---|