PROJECT DETAILS

Project Submission No. S00901
Project Title Kalfaköy Wind Power Plant
Project Owner (as per PSF & LOA) Kırca Enerji Yatırım Üretim ve Ticaret A.Ş.
Focal Point of Project Owners*(FP)
PROFED ENERJİ ÇEVRE DAN. SAN. VE TİC. LTD. ŞTİ.
Email of Contact Person of FP (Primary) kagan.pehlivan@profed.com.tr
Email of Contact Person of FP (Secondary) ozge@profed.com.tr
Country Türkiye
Submission Date 2 Jul 2022
Global Stakeholder Consultation Period 22 Feb 2023 - 8 Mar 2023
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version AMS-I.D.: Grid Connected Renewable Electricity Generation --- Version 18.0
Forecasted GHG Emission Reduction(TCO2/Year) 25,539
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals SDG 7, SDG 8, SDG 9, SDG 13
Forecasted SDG+ Label Gold
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization Profed Enerji Çevre Dan. San. ve Tic. Ltd. Şti.
Name of Focal Point of External Representative Kağan Pehlivan
Email-id of Focal Point kagan.pehlivan@profed.com.tr
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet, Other Documents
Project Brief

Kalfaköy Wind Power Plant has been established and operated by Kırca Enerji Yatırım Üretim ve Ticaret A.Ş. The project involves installation and operation of 6 GE103 turbines, each having 1.7 MW capacity with total installed capacity of 10.2 MW. The project area is in Gönen province of Balıkesir, Turkey. The annual generation is expected to be 39,400 MWh, according to generation licence. The average annual emission reduction estimated for this project is 25,539 tonnes of CO2. During the crediting period, 255,390 tonnes of CO2 are expected to be reduced.

Additional Information