PROJECT DETAILS

Project Submission No. S00590
Project Title 330 MW Solar Power project in Piauí by CGN
Project Owner(s) (as per PSF & LOA) 1. CGN Brasil Energia e Participações S.A., 2. Kosher Climate India Private Limited
Submission Date 2022-07-02
Global Stakeholder Consultation Period 2022-11-14 to
2022-11-28
Registration Date 2026-07-09
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Solar Power
GCC/CDM Methodology & Version ACM0002 Grid-connected electricity generation from renewable sources, Version 21.0
Forecasted GHG Emission Reduction (tCO2e/Year) 210,764
Verified GHG Emission Reduction (tCO2e/Year) 210,764
Forecasted E+ Label Yes
Verified E+ Label Yes
Forecasted S+ Label Yes
Verified S+ Label Yes
Forecasted SDG+ Goals
Verified SDG+ Goals
Forecasted SDG+ Label Gold
Verified SDG+ Label Gold
Forecasted Market Eligibility C+ - Pilot Phase
Verified Market Eligibility C+ - Pilot Phase
Location Details Open Full Map
Country
 Brazil
Focal Point of Project Owners
Kosher Climate India Private Limited
Email of Contact Person of FP (Primary) narendra@kosherclimate.com
Email of Contact Person of FP (Secondary) vamsi@kosherclimate.com
Project Verifier Carbon Check (India) Private Limited
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Request For Registration Documents Verified Project Submision
Verified Calculation Sheet

Other Verified Documents
Request for Registration Form Registration Form
Project Brief

The purpose of this bundled project is to generate electricity by harnessing the solar energy by utilizing solar irradiation through photovoltaic technology and thereby feed the generated power to the Brazilian national grid, the National Interconnected System (SIN).
The bundled project comprises six bundles with the installation of eleven solar photovoltaic power generation plants at different locations with installed capacity of 30 MWAC each with a total bundled project capacity of 330 MWAC. The project activities within each bundle is located in the same district of Brazil. Each project activity has installed solar photovoltaic panels to convert the available solar radiation into DC power and the installed Inverters convert the DC power to AC Power.

VERIFICATION OUTCOME
Report (Public) Verification Report (public)
Verification report date 2026-03-30
First Request for Registration Date 2023-11-09
Opinion

CCIPL was contracted by Kosher Climate India Private Limited on 31/01/2023 for project verification of the project activity “330 MW Solar Power project in Piauí by CGN”. The PSF, Version 06, dated 02/08/2024, provided by the PO was considered. The project verification was performed based on rules and requirements defined by GCC for the project activity.

The project activity is a solar power project, which results in reductions of CO2e emissions that are real, measurable and give long-term benefits to the mitigation of climate change. It is demonstrated that the project is not a likely baseline scenario and the emission reductions attributable to the project are, hence, additional to any that would occur in the absence of the project activity. The project correctly applies the approved baseline and monitoring ACM0002 “Grid-connected electricity generation from renewable sources”, Version 21.0 and is assessed against latest valid Project Standard V 3.1, Verification Standard V 3.1 and Environment and Social Safeguards Standard V 3.0, Project-Sustainability-Standard V3.1 and/or other applicable GCC/CDM Decisions/Tools/Guidance/Forms /B01/.

The project activity is likely to achieve the anticipated emission reductions stated in the PSF provided the underlying assumptions do not change. The expected emission reductions (annual average) from the project activity are estimated to be 210,764   tCO2e/ year and reduces a total of 2,107,649    tCO2 over the 10 years crediting period starting from 17/05/2019 to 16/05/2029.

CCIPL has informed the project owners of the project verification outcome through the draft project verification report and final project verification report. The final project verification report contains the information regarding fulfilment of the requirements for project verification, as appropriate.

CCIPL applied the following verification process and methodology using a competent verification team.

·        The desk review of documents and evidence submitted by the project owner in context of the reference GCC rules and guidelines issued,

·        Undertaking/conducting site visit, interview, or interactions with the representative of the project owner.

·        Reporting audit findings with respect to clarifications and non-conformities and the closure of the findings, as appropriate

·        Preparing a draft verification opinion based on the auditing findings and conclusions.

·        Technical review of the draft project verification opinion along with other documents as appropriate by an independent competent technical review team.

·        Finalization of the project verification opinion (this report)

 

CARBON CHECK (INDIA) PRIVATE Limited (CCIPL) has verified and hereby certifies that the GCC project activity “330 MW Solar Power project in Piauí by CGN”.

a. Has correctly described the Project Activity in the Project Submission Form (Version 10, dated 09/02/2026) including the applicability of the approved methodology ACM0002, Grid-connected electricity generation from renewable sources, version 21.0 and meets the methodology applicability conditions, is additional and is expected to achieve the forecasted real, measurable and additional GHG emission reductions, complies with the monitoring methodology, has appropriately conducted local and global stakeholder consultation processes and has calculated emission reduction estimates correctly and conservatively.

b. Is likely to generate GHG emission reductions amounting to the estimated 2,107,649    tCO2e for whole crediting period as indicated in the PSF, which are additional to the reductions that are likely to occur in absence of the Project Activity and complies with all applicable GCC rules, including ISO 14064-2 and ISO 14064-3, and therefore requests the GCC Program to register the Project Activity.

c. is not likely to cause any net-harm to the environment and/or society and complies with the environmental and Social Safeguards Standard, and therefore requests the GCC Program to register the Project Activity, which is likely to achieve the requirements of the Environmental No net-harm Label (E+) and the Social No-net-harm Label (S+); and       

d. is likely to contribute to the achievement of United Nations Sustainable Development Goals (SDGs), comply with the Project Sustainability Standard, and contribute to achieving a total of 4 SDGs, which is likely to achieve the gold SDG certification label (SDG+).

The Project Activity complies with all the applicable requirement of the GCC Program and ICAO’s requirements on CORSIA Emissions Unit Eligibility Criteria and CORSIA Eligible Emissions Units, as per Clarification No 1., v1.31 paragraph 23-25. In its latest decision, the ICAO Council on “CORSIA Eligible Emissions Unit” from GCC Program for CORSIA First Phase (2024 – 2026 compliance period): only ACCs issued to activities involving grid-connected renewable electricity generation/supply that are estimated to have a maximum output capacity lesser than 15 megawatts of electricity (at the time of registration), individually or grouped. Hence, CORSIA label for this project is only available until 31/12/2020.So, the ACCs expected to be issued during the crediting period only until 31/12/2020 is likely to be CORSIA eligible.