Project Submission No. | S00834 |
---|---|
Project Title | Bundle 3 Solar power project in India |
Project Owner(s) (as per PSF & LOA) | UltraTech Cement Limited |
Submission Date | 2022-07-02 |
Global Stakeholder Consultation Period |
2023-01-19 to 2023-02-02 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
Project Type | Solar Power |
GCC/CDM Methodology & Version | GCCM001 Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers, version 4.0 |
Forecasted GHG Emission Reduction (tCO2e/Year) |
![]() |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
Forecasted SDG+ Goals |
![]() ![]() ![]() |
Forecasted SDG+ Label | Silver |
Forecasted Market Eligibility | C+ - Pilot Phase |
Location Details
Open Full Map
|
|
Country |
India
|
---|---|
Focal Point of Project Owners
|
UltraTech Cement Limited |
Email of Contact Person of FP (Primary) | anand.bindal@adityabirla.com |
Email of Contact Person of FP (Secondary) | raj.narayanan@adityabirla.com |
Name of Authorized External Representative Organization | M/s Regent Climate Connect Knowledge Solutions Pvt Ltd |
Name of Focal Point of External Representative | Rahul Rana |
Email-id of External representative | rahul.rana@climateconnect.digital |
Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
Project Brief | This bundled project activity involves the installation of three numbers of Solar Power Projects in Chhattisgarh and Madhya Pradesh States of India. The purpose of the project activity is to generate clean electricity with utilization of solar energy for captive use. The total installed capacity of the project activity is 32.15 MW (DC) and 23.125 MW(AC); which involves operation of three solar projects of 8.125, 6.25 and 8.75 (AC Capacity) project in Chhattisgarh and Madhya Pradesh States. The solar PV modules have a useful life of 25 years.. |
---|---|
Additional Information | This project activity will replace average anthropogenic emissions of greenhouse gases (GHG’s) estimated to be approximately 38,660 tCO2e per year, thereon displacing estimated average of 41,526 MWh/year amount of electricity from the generation-mix of power plants connected to the Indian grid for captive use, which is mainly dominated by thermal/fossil fuel-based power plant. The project activity reduces 386,609 tCO2e emissions during the entire crediting period. |