Project Submission No. | S00834 |
---|---|
Project Title | Bundle 3 Solar power project in India |
Project Owner (as per PSF & LOA) | UltraTech Cement Limited |
Focal Point of Project Owners*(FP)
|
UltraTech Cement Limited |
Email of Contact Person of FP (Primary) | anand.bindal@adityabirla.com |
Email of Contact Person of FP (Secondary) | raj.narayanan@adityabirla.com |
Country | India |
Submission Date | 2 Jul 2022 |
Global Stakeholder Consultation Period | 19 Jan 2023 - 2 Feb 2023 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
GCC/CDM Methodology & Version | GCCM001: Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers |
Forecasted GHG Emission Reduction(TCO2/Year) | 40,380 |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
---|---|
Forecasted SDG+ Goals | 5,7,8 |
Forecasted SDG+ Label | Gold |
Forecasted Market Eligibility | CORSIA(C+) |
Name of Authorized External Representative Organization | M/s Regent Climate Connect Knowledge Solutions Pvt Ltd |
Name of Focal Point of External Representative | Rahul Rana |
Email-id of Focal Point | rahul.rana@climateconnect.digital |
Documents for Global Stakeholder Consultation | Project Submision, Calculation Sheet, Other Documents |
Project Brief | The proposed bundled project activity involves the installation of three numbers of Solar Power Projects in Chhattisgarh and Madhya Pradesh States of India. The purpose of the project activity is to generate clean electricity with utilization of solar energy through third party sale. The total installed capacity of the propose project activity is 23.125 MW(AC); which involves operation of three solar projects of 8.125, 6.25 and 8.75 (AC Capacity) project in Chhattisgarh and Madhya Pradesh States. |
---|---|
Additional Information | This project activity will replace average anthropogenic emissions of greenhouse gases (GHG’s) estimated to be approximately 40,380 tCO2e per year, thereon displacing estimated average of 43,537 MWh/year amount of electricity from the generation-mix of power plants connected to the Indian grid for captive use, which is mainly dominated by thermal/fossil fuel-based power plant. The project activity reduces 403,806 tCO2e emissions during the entire crediting period. |