PROJECT DETAILS

Project Submission No. S00833
Project Title Bundled 4 Solar power project in India
Project Owner(s) (as per PSF & LOA) UltraTech Cement Limited
Submission Date 2022-07-02
Global Stakeholder Consultation Period 2023-01-19 to
2023-02-02
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Solar Power
GCC/CDM Methodology & Version AMS-I.F.: Renewable energy generation for captive use and mini-gird, version 5.0
Forecasted GHG Emission Reduction (tCO2e/Year) 14,021
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Silver
Forecasted Market Eligibility C+ - Pilot Phase
Location Details Open Full Map
Country
 India
Focal Point of Project Owners
UltraTech Cement Limited
Email of Contact Person of FP (Primary) anand.bindal@adityabirla.com
Email of Contact Person of FP (Secondary) raj.narayanan@adityabirla.com
Name of Authorized External Representative Organization M/s Regent Climate Connect Knowledge Solutions Pvt Ltd
Name of Focal Point of External Representative Rahul Rana
Email-id of External representative rahul.rana@climateconnect.digital
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

This bundled project activity involves the installation of three numbers of Solar Power Projects in Orissa /Madhya Pradesh/Maharashtra states of India. The purpose of the project activity is to generate clean electricity with utilization of solar energy through third party sale. The total installed capacity of the project activity is 9 MW(AC); which involves operation of three solar   projects of 2, 2, & 5 MW (AC Capacity) project in Orissa /Madhya Pradesh/Maharashtra State.

Additional Information

This project activity will replace average anthropogenic emissions of greenhouse gases (GHG’s) estimated to be approximately 14,021 tCO2e per year, thereon displacing estimated average of 15,060 MWh/year amount of electricity from the generation-mix of power plants connected to the Indian grid for captive use, which is mainly dominated by thermal/fossil fuel-based power plant. The project activity reduces 140,206 tCO2e emissions during the entire crediting period.