PROJECT DETAILS

Project Submission No. S00356
Project Title 12.5MW Waste Heat Recovery based power generation at MHIPL
Project Owner (as per PSF & LOA) (1) My Home Power Consultancy Services Private Limited, and (2) My Home Industries Private Limited
Focal Point of Project Owners*(FP)
My Home Power Consultancy Services Private Limited
Email of Contact Person of FP (Primary) kkrishnan@mhpcsl.in
Email of Contact Person of FP (Secondary) rkrc@mhpcsl.in
Country India
Submission Date 2 Jul 2022
Global Stakeholder Consultation Period 11 Sep 2022 - 25 Sep 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version ACM0012- Waste energy recovery, Version-06.0
Forecasted GHG Emission Reduction(TCO2/Year) 62087
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals SDG Goals: SDG 7, 8, 9, 11 and 13
Forecasted SDG+ Label Platinum
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization
Name of Focal Point of External Representative
Email-id of Focal Point
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet, Other Documents
Project Brief

My Home Industries Private Limited has started its operation in 1998 with production capacity of 500,000 Tonnes Per Annum (MTPA) cement capacity at Mellacheruvu Cement Works, Telangana. MHIPL has upgraded their plant to increase clinker production capacity and Mellacheruvu Cement Works unit prior to investment decision, currently has three kilns with individual processing capacities of 2400t/day (kiln1), 4000t/day (kiln2) and 4200t/day (kilnl3) respectively with aggregated processing capacity of 3.5MTPA. The project scenario is to develop the waste heat power generation project through the recovery and utilization of waste heat generated by all Preheaters (PH1, PH2, PH3) in line kiln1, kiln2 & kiln3 and AQC1, AQC2 and AQC3. The waste gas after extracting heat will be vented in atmosphere through Raw mill and coal section after cooling. The project has installed 6 high pressure and 3 low pressure heat recovery boilers with 1 set of single injection condensing turbine-generator unit with the installed capacity of 12.5 MW. The annual design power generation amounts to 76,650 MWh and yearly net power supply to cement plant is 68,985 MWh. The estimated annual average and the total CO2e emission reduction by the project activity over the first renewable crediting period of 10 years are expected to be 62,087 tCO2e and 620,870 tCO2e respectively.

Additional Information