Project Submission No. | S00481 |
---|---|
Project Title | 16 MW Muong Bang Hydropower Plant |
Project Owner(s) (as per PSF & LOA) | East Asean Energy and Trade Joint Stock Company |
Submission Date | 2022-07-02 |
Global Stakeholder Consultation Period |
2022-10-06 to 2022-10-20 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
Project Type | Hydro Power |
GCC/CDM Methodology & Version | ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
Forecasted GHG Emission Reduction (tCO2e/Year) |
![]() |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
Forecasted SDG+ Goals |
![]() ![]() ![]() ![]() ![]() |
Forecasted SDG+ Label | Platinum |
Forecasted Market Eligibility | C+ - Pilot Phase |
Country |
Viet Nam
|
---|---|
Focal Point of Project Owners
|
Kosher Climate India Private Limited |
Email of Contact Person of FP (Primary) | narendra@kosherclimate.com |
Email of Contact Person of FP (Secondary) | dinhkhac@elc.vn |
Name of Authorized External Representative Organization | Kosher Climate India Private Limited |
Name of Focal Point of External Representative | Narendra Kumar Ramraj |
Email-id of External representative | Narendra@kosherclimate.com |
Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
Project Brief | The Purpose of this project activity is to generate the clean electricity from the hydropower and feed the generated electricity to the Vietnam national grid. The Muong Bang project is a river bed type hydroelectric project. The project area is located along Muong Bang commune, Phu Yen district, Son La province, Vietnam. The project is commissioned, operational and the total project capacity has been connected to the national Grid of Vietnam through the erected distribution and transmission lines. Generated power from the project is being supplied to the Provincial Vietnam Electricity Corporation (EVN). |
---|