PROJECT DETAILS

Project Submission No. S00836
Project Title Bundled 1 Solar Power Project in India
Project Owner(s) (as per PSF & LOA) UltraTech Cement Limited
Submission Date 2022-07-02
Global Stakeholder Consultation Period 2023-01-19 to
2023-02-02
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Solar Power
GCC/CDM Methodology & Version GCCM001 Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers version 4.0
Forecasted GHG Emission Reduction (tCO2e/Year) 26,379
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Silver
Forecasted Market Eligibility C+ - Pilot Phase
Location Details Open Full Map
Country
 India
Focal Point of Project Owners
UltraTech Cement Limited
Email of Contact Person of FP (Primary) anand.bindal@adityabirla.com
Email of Contact Person of FP (Secondary) raj.narayanan@adityabirla.com
Email-id of External representative anand.bindal@adityabirla.com
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

The bundled project activity involves the installation of four numbers of Solar Power Projects  in Madhya Pradesh/Tamil Nadu/Gujarat/West Bengal States of India. The purpose of the project activity is to generate clean electricity with utilization of solar energy. The total installed capacity of the   project activity is 16.15 MW(AC); which involves operation of four solar projects of 12.75, 1.60, 0.80 & 1.00 MW (AC Capacity) project in Madhya Pradesh/Tamil Nadu/Gujarat/West Bengal State.

Additional Information

This project activity will replace average anthropogenic emissions of greenhouse gases (GHG’s) estimated to be approximately 26,379 tCO2e per year, thereon displacing estimated average of 28,334 MWh/year amount of electricity from the generation-mix of power plants connected to the Indian grid for captive use, which is mainly dominated by thermal/fossil fuel-based power plant. The project activity reduces 263,792 tCO2e emissions during the entire crediting period.