PROJECT DETAILS

Project Submission No. S00448
Project Title Assuruá II, Delta 5-6 and Delta 7-8 Complex Project
Project Owner (as per PSF & LOA) Omega Geração S.A.
Focal Point of Project Owners*(FP)
Livia Mariz Junqueira
Email of Contact Person of FP (Primary) esg@omegaenergia.com.br
Email of Contact Person of FP (Secondary) raquel.argentino@omegaenergia.com.br
Country Brazil
Submission Date 1 Jul 2022
Global Stakeholder Consultation Period 2 Oct 2022 - 16 Oct 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version ACM0002 – Grid-connected electricity generation from renewable sources V20.0
Forecasted GHG Emission Reduction(TCO2/Year) 801,102
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals 1, 2, 4, 6, 7, 8, 9, 10 and 11
Forecasted SDG+ Label Diamond
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization
Name of Focal Point of External Representative
Email-id of Focal Point esg@omegaenergia.com.br
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet, Other Documents
Project Brief

The proposed project activity consists in the implementation and operation of nineteen new wind electricity generation facilities, Assuruá II, Assuruá III, Capoeiras III, Curral de Pedras I, Curral de Pedras II, Diamante II, Diamante III, Laranjeiras I, Laranjeiras II, Laranjeiras V, Delta 5 I, Delta 5 II, Delta 6 I, Delta 6 II, Delta 7 I, Delta 7 II and Delta 8 (7III) , located in two main municipalities: Gentio do Ouro, in the Bahia state and the municipality of Parnaíba, in the Maranhão state, in Brazil. The project activity will employ 173 horizontal-axis aerogenerators. The physical implementation of the project activity started on 04/01/2018, date of the first dispatch of National Interconnected System (Sistema Interligado Nacional – SIN).

The project activity will deliver 1,900,011 MWh/year of renewable electricity to the National Interconnected System (Sistema Interligado Nacional - SIN). In the baseline scenario, electricity delivered to the grid by the project activity would have been generated by the operation of grid-connected power plants and by the addition of new generation sources, as reflected in the combined margin (CM) calculations. Hence, the project activity will promote GHG emissions reductions by displacing fossil fuel-based electricity generation that would otherwise occur.

Additional Information