Project Submission No. | S00463 |
---|---|
Project Title | 50 MW Rawra Solar Energy Project |
Project Owner (as per PSF & LOA) | Adani Solar Energy Jodhpur Two Limited; Adani Green Energy Limited |
Focal Point of Project Owners*(FP)
|
Adani Green Energy Limited |
Email of Contact Person of FP (Primary) | emission.reductions@adani.com |
Email of Contact Person of FP (Secondary) | sandip.saha@adani.com |
Country | India |
Submission Date | 1 Jul 2022 |
Global Stakeholder Consultation Period | 2 Oct 2022 - 16 Oct 2022 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
GCC/CDM Methodology & Version | ACM0002 Grid-connected electricity generation from renewable sources - Version 20.0 |
Forecasted GHG Emission Reduction(TCO2/Year) | 103,279 |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
---|---|
Forecasted SDG+ Goals | 3, 5, 7, 8, 9 & 13 |
Forecasted SDG+ Label | Diamond |
Forecasted Market Eligibility | CORSIA(C+) |
Name of Authorized External Representative Organization | |
Name of Focal Point of External Representative | |
Email-id of Focal Point | emission.reductions@adani.com |
Documents for Global Stakeholder Consultation | Project Submision, Calculation Sheet, Other Documents |
Project Brief | The project activity is a solar PV installation by Adani Solar Energy Jodhpur Two Limited, a subsidiary of Adani Green Energy Limited. The project activity is a greenfield installation that produces 110,993 MWh of electricity per annum, that displaces 103,279 tCO2/Annum. The quantity of electricity generated is supplied via state grid and that equivalently displaces carbon emissions from the highly intensive coal based thermal generating systems in the absence of the project activity. |
---|---|
Additional Information |