Project Submission No. | S00088 |
---|---|
Project Title | CTGR Zuoyun Shuiyao Solar Power Project |
Project Owner (as per PSF & LOA) | Climate Bridge (Shanghai) Ltd. |
Focal Point of Project Owners*(FP)
|
Climate Bridge (Shanghai) Ltd. |
Email of Contact Person of FP (Primary) | projects@climatebridge.com |
Email of Contact Person of FP (Secondary) | huang.shanfeng@climatebridge.com |
Country | China |
Submission Date | 19 Jan 2022 |
Global Stakeholder Consultation Period | 31 Jan 2022 - 14 Feb 2022 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
GCC/CDM Methodology & Version | ACM0002 version20.0 |
Forecasted GHG Emission Reduction(TCO2/Year) | 116,563 |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
---|---|
Forecasted SDG+ Goals | #7, #8 |
Forecasted SDG+ Label | Silver |
Forecasted Market Eligibility | CORSIA(C+) |
Name of Authorized External Representative Organization | |
Name of Focal Point of External Representative | |
Email-id of Focal Point | |
Documents for Global Stakeholder Consultation | Project Submision, Calculation Sheet, Other Documents |
Project Brief | CTGR Zuoyun Shuiyao Solar Power Project is a grid-connected solar photovoltaic power plant with installed capacity of 100 MWp, which locates in Zuoyun County, Datong City, Shanxi Province, P.R. China. The project is developed and operated by Three Gorges New Energy Zuoyun Co., Ltd. The project is expected to supply an annual average of 140,964 MWh of zero-emission electricity to NCPG during the fixed 10-year crediting period, and the project is expected to achieve a green-house gas emission reduction of 116,563 tCO2e annually. The total emission reductions during the fixed 10-year crediting period would be 1,165,632 tCO2e. |
---|---|
Additional Information |