Project Submission No. | S00619 |
---|---|
Project Title | Dau Tieng 2 Solar Power Plant Project |
Project Owner (as per PSF & LOA) | Monsoon Carbon Pte Ltd |
Submission Date | 1 Jul 2022 |
Global Stakeholder Consultation Period | 21 Nov 2022 - 5 Dec 2022 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
Project Type | Solar Power |
GCC/CDM Methodology & Version | ACM0002 v21.0 |
Forecasted GHG Emission Reduction (tCO2e/Year) | 323,490 (tCO2e/Year) |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
Forecasted SDG+ Goals | |
Forecasted SDG+ Label | Gold |
Forecasted Market Eligibility | CORSIA(C+) |
Location Details Open Full Map
|
|
Country | Viet Nam |
---|---|
Focal Point of Project Owners (FP)
|
Monsoon Carbon Pte Ltd |
Email of Contact Person of FP (Primary) | amcewin@monsooncarbon.com |
Email of Contact Person of FP (Secondary) | carbon@monsooncarbon.com |
Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
Project Brief | The Project title is Dau Tieng 2 Solar Power Plant Project. The purpose of this Project Activity is to generate the clean electricity from the installation of photovoltaic (PV) solar panels and supply the generated electricity to the Vietnam National Grid. The proposed Project Activity involves the installation of a single solar power plant and is implemented by Dau Tieng Tay Ninh Energy Joint Stock Company (“DTE”). |
---|---|
Additional Information |
Opinion | Carbon Check (India) Private Limited (CCIPL) has been contracted by Monsoon Carbon Pte. Ltd. (Entity having authorization of Project Owners) as per contract No. CIPL1598/GCC/VAL/DTSP/20221007, dated 07/12/2022 to undertake the independent project verification of the GCC project activity titled “Dau Tieng 2 Solar Power Plant Project” (hereafter the project). The objectives of this project verification is to verify that the GCC project meets the requirements of GCC project framework v2.1, GCC program manual v3.1, GCC program processes v4.0, GCC project standard v3.1, GCC project sustainability standard v3.1, GCC verification standard v3.1, GCC Environment & Social safeguards standard v3.0, ISO 14064-2 & ISO 14064-3, applicable approved CDM Methodology ACM0002: Grid-connected electricity generation from renewable sources, version 21.0, Applicable Legal requirements/rules of host country, National Sustainable Development Criteria and CORSIA requirements and other GCC requirements related to aspects such as project design, applicable conditions, project boundary, baseline scenarios, additionality, emission reduction, monitoring plan, local stakeholder consultation, global stakeholder consultation, GHG emission reductions (ACCs), environmental no-net harm label (E+), social no net harm label (S+), Gold SDG label (SDG+), CORSIA(C+). This report summarizes the final project verification opinion which is based on final PSF /2/. The GCC project activity involved the construction and operation of Greenfield 240 MWp/ 200 MWe solar power plant in Vietnam. The expected net annual electricity generation of the project activity is approximately 393,074 MWh/year. The electricity thus generated will be sold to the Vietnam National Grid. In the absence of the project activity, the equivalent amount of electricity would be supplied from GHG intensive national grid. The emission reduction will be based on the amount of baseline electricity avoided due to the project and is calculated using the applied CDM Methodology for “Grid-connected electricity generation from renewable sources” ACM0002 v21.0. |
---|---|
Report (Public) | Verification Report (public) |
Verification report date | 2023-11-09 |
First Request for Registration Date | 2023-11-09 |