PROJECT DETAILS

Project Submission No. S01093
Project Title VDB e Pirapora Renewable Energy Project
Project Owner(s) (as per PSF & LOA) EDF EN DO BRASIL PARTICIPAÇÕES LTDA / OMEGA GERAÇÃO S.A. .
Submission Date 2022-07-01
Global Stakeholder Consultation Period 2023-12-13 to
2023-12-27
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Wind Power,Solar Power
GCC/CDM Methodology & Version ACM0002 – Grid-connected electricity generation from renewable sources V21.0
Forecasted GHG Emission Reduction (tCO2e/Year) 378,491
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Diamond
Forecasted Market Eligibility C+ - Pilot Phase
Country
 Brazil
Focal Point of Project Owners
EDF EN DO BRASIL PARTICIPAÇÕES LTDA
Email of Contact Person of FP (Primary) comercial@edf-re.com.br
Email of Contact Person of FP (Secondary) backoffice@edf-re.com.br
Email-id of External representative comercial@edf-re.com.br
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

The proposed project activity consists in the implementation and operation of a new wind electricity generation facility named Ventos da Bahia, and a new Photovoltaic electricity facility named Pirapora.
The Ventos da Bahia I Wind Farm was EDF EN DO BRASIL PARTICIPAÇÕES LTDA. first venture in Brazil. The Complex has 66 MW in operation since 2017. In December 2020, Omega Geração S.A., acquired 50% of the complex.
The complex, which is located in the municipalities of Mulungu do Morro and Bonito, 340 km from Salvador, in the state of Bahia, employs 22 horizontal-axis aerogenerators (model: Acciona AW3000), with total nominal capacity: 66 MW.
Meanwhile, Pirapora PV project is located in Minas Gerais State, in the municipality of Pirapora. The project consists of 11 adjacent PV plants with a nominal power between 27 and 30 MWac each one, with total nominal capacity: 321 MW. All plants connect with a common substation which is connected to the existing Pirapora 2 substation. In December 2018, Omega Geração S.A., acquired 50% of the complex.