PROJECT DETAILS

Project Submission No. S00564
Project Title Taihe Municipal Solid Waste Incineration for Power Generation Project
Project Owner (as per PSF & LOA) Beijing Tianying Zero Carbon Technology Research Institute Co, Ltd.
Submission Date 1 Jul 2022
Global Stakeholder Consultation Period 31 Oct 2022 - 14 Nov 2022
Sector 13.Waste handling and disposal
Project Type MSW/TDF/RDF Incineration
GCC/CDM Methodology & Version ACM0022:“Alternative waste treatment processes” (Version 3.0)
Forecasted GHG Emission Reduction (tCO2e/Year) 41,621.32 (tCO2e/Year)
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Platinum
Forecasted Market Eligibility CORSIA(C+)
Location Details Open Full Map
Country China
Focal Point of Project Owners (FP)
Beijing Tianying Zero Carbon Technology Research Institute
Email of Contact Person of FP (Primary) wangrj01@ctyi.com.cn
Email of Contact Person of FP (Secondary) liub05@ctyi.com.cn
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

Taihe Municipal Solid Waste Incineration for Power Generation Project is invested and operated by Taihe Tianying Eco-Energy Co., Ltd., and is located in Shuangxing Village, Shuangfu Town, Taihe County, Fuyang City, Anhui Province, P.R. China. The purpose of the project is to dispose the municipal solid waste in Taihe County through incineration, and simultaneously utilizing the residual heat for power generation. The Project is estimated to dispose approximately 219,000t of solid waste , and 66,300MWh of electricity is expected to be supplied to the East China Power Grid with full work load annually. The baseline scenario for MSW treatment is the disposal of the waste in landfill site without capturing landfill gas and the baseline scenario for electricity generation is same amount of electricity would be supplied by ECPG. The  estimated emission reductions over the 10-year crediting period of the project total are 416,213.20tCO2e.

Additional Information
VERIFICATION OUTCOME
Opinion

The GCC Project Verifier [Shenzhen CTI International Certification Co., Ltd (CTI)], has verified and certifying that the GCC Project Activity [Taihe Municipal Solid Waste Incineration for Power Generation Project]:

(a) has correctly described the Project Activity in the Project Submission Form (version 2.0, dated 28/10/2023) including the applicability of the approved methodology [ACM0022: “Alternative waste treatment processes” (Version 03.0)] and meets the methodology applicability conditions, is additional and is expected to achieve the forecasted real and additional GHG emission reductions, complies with the monitoring methodology, has appropriately conducted local and global stakeholder consultation processes and has calculated emission reduction estimates correctly and conservatively;

(b) is likely to generate GHG emission reductions amounting to the estimated [367,328] tCO2e, as indicated in the PSF, which are additional to the reductions that are likely to occur in absence of the Project Activity and complies with all applicable GCC rules, including ISO 14064-2 and ISO 14064-3, and therefore requests the GCC Program to register the Project Activity;

(c) is not likely to cause any net-harm to the environment and/or society and complies with the Environmental and Social Safeguards Standard, and therefore requests the GCC Program to register the Project Activity, which is likely to achieve the requirements of the Environmental No-net-harm Label (E+) and the Social No-net harm Label (S+); and

(d) is likely to contribute to the achievement of United Nations Sustainability Development Goals (SDGs), comply with the Project Sustainability Standard, and contribute to achieving a total of [5] SDGs (SDG 4, 7, 8, 9, 13), which is likely to achieve the [Platinum] SDG certification label (SDG+).

Report (Public) Verification Report (public)
Verification report date 2023-10-30
First Request for Registration Date 2023-10-31