IMPORTANT UPDATE: We are migrating to GCC 2.0. We have restricted new projects registration and further updates to migrated project. Please visit to GCC 2.0.

PROJECT DETAILS

Project Submission No. S00675
Project Title Junan Municipal Solid Waste Incineration For Power Generation Project
Project Owner(s) (as per PSF & LOA) Beijing Tianying Zero Carbon Technology Research Institute Co, Ltd.
Submission Date 2022-07-01
Global Stakeholder Consultation Period 2022-12-06 to
2022-12-20
Sector 13.Waste handling and disposal
Project Type MSW Management
GCC/CDM Methodology & Version ACM0022:Large-scale Consolidated Methodology Alternative waste treatment processes(Version 03.0)
Forecasted GHG Emission Reduction (tCO2e/Year) 63,073
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Diamond
Forecasted Market Eligibility
Location Details Open Full Map
Country
 China
Focal Point of Project Owners
Beijing Tianying Zero Carbon Technology Research Institute
Email of Contact Person of FP (Primary) wangrj01@ctyi.com.cn
Email of Contact Person of FP (Secondary) liub05@ctyi.com.cn
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

Junan Municipal Solid Waste Incineration For Power Generation Project in Shandong Province (hereinafter referred to as the Project), which is located in Southeast of Wangzhuangzi Village, Shizi Road Town, Ju 'nan County, Linyi City, Shandong Province, People's Republic of China, is developed by Junan Tianying environmental protection energy co., ltd. The purpose of the Project is to dispose the MSW in the area of Ju 'nan County by incineration, and simultaneously recovering the energy for power generation. The Project will dispose around 219000 tonnes of municipal solid waste (MSW) per year through grate furnace incineration technology. The installed capacity of the Project is 12MW (1×12MW) and the estimated electricity supplied by the Project is 62049.3MWh.

Prior to the Project, the MSW of Ju 'nan County is treated at the landfill site, where the landfill gas (LFG) will be released directly to the atmosphere without collection or utilization. Equivalent amount of annual power output will be generated and supplied by North China Power Grid (hereinafter referred to as NCPG) which the Project is connected to. This is the same as the baseline scenario of the Project.

© 2025 Global Carbon Council