PROJECT DETAILS

Project Submission No. S00675
Project Title Junan Municipal Solid Waste Incineration For Power Generation Project
Project Owner (as per PSF & LOA) Beijing Tianying Zero Carbon Technology Research Institute Co, Ltd.
Submission Date 1 Jul 2022
Global Stakeholder Consultation Period 6 Dec 2022 - 20 Dec 2022
Sector 13.Waste handling and disposal
Project Type MSW Management
GCC/CDM Methodology & Version ACM0022:Large-scale Consolidated Methodology Alternative waste treatment processes(Version 03.0)
Forecasted GHG Emission Reduction (tCO2e/Year) 68,264 (tCO2e/Year)
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Platinum
Forecasted Market Eligibility N/A
Location Details Open Full Map
Country China
Focal Point of Project Owners (FP)
Beijing Tianying Zero Carbon Technology Research Institute
Email of Contact Person of FP (Primary) wangrj01@ctyi.com.cn
Email of Contact Person of FP (Secondary) liub05@ctyi.com.cn
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

Junan Municipal Solid Waste Incineration For Power Generation Project in Shandong Province (hereinafter referred to as the Project), which is located in Southeast of Wangzhuangzi Village, Shizi Road Town, Ju 'nan County, Linyi City, Shandong Province, P.R. China, is developed by Junan Tianying environmental protection energy co., ltd. The purpose of the Project is to dispose the MSW in the area of Ju 'nan County by incineration, and simultaneously recovering the energy for power generation. The Project will dispose around 219000 tonnes of municipal solid waste (MSW) per year through grate furnace incineration technology. The installed capacity of the Project is 12MW (1×12MW) and the estimated electricity supplied by the Project is 62049.3MWh.

Prior to the Project, the MSW of Ju 'nan County is treated at the landfill site, where the landfill gas (LFG) will be released directly to the atmosphere without collection or utilization. Equivalent amount of annual power output will be generated and supplied by North China Power Grid (hereinafter referred to as NCPG) which the Project is connected to. This is the same as the baseline scenario of the Project.

Additional Information
VERIFICATION OUTCOME
Opinion

The GCC Project Verifier Shenzhen CTI International Certification Co., Ltd (CTI), has verified and certify that the GCC Project Activity Junan Municipal Solid Waste Incineration For Power Generation Project:

(a). has correctly described the Project Activity in the Project Submission Form (version 4.0, dated 29/11/2023) including the applicability of the approved methodology ACM0022, version 03.0 and meets the methodology applicability conditions, is additional and is expected to achieve the forecasted real and additional GHG emission reductions, complies with the monitoring methodology, has appropriately conducted local and global stakeholder consultation processes and has calculated emission reduction estimates correctly and conservatively;

(b). is likely to generate GHG emission reductions amounting to the estimated 63,073 tCO2eq/annum, as indicated in the PSF, which are additional to the reductions that are likely to occur in absence of the Project Activity and complies with all applicable GCC rules, including ISO 14064-2 and ISO 14064-3, and therefore requests the GCC Program to register the Project Activity;

(c). is not likely to cause any net-harm to the environment and/or society and complies with the Environmental and Social Safeguards Standard, and therefore requests the GCC Program to register the Project Activity, which is likely to achieve the requirements of the Environmental No-net-harm Label (E+) and the Social No-net harm Label (S+); and

(d). is likely to contribute to the achievement of United Nations Sustainability Development Goals (SDGs), comply with the Project Sustainability Standard, and contribute to achieving a total of 5 SDGs, which is likely to achieve the Platinum SDG certification label (SDG+).

(e). The Project Activity complies with all the applicable requirements of the GCC Program and ICAO‘s requirements on CORSIA Emissions Unit Eligibility Criteria and CORSIA Eligible Emissions Units, as per Clarification No 1., v1.3 paragraph 23-25, and the ACCs expected to be issued during the crediting period is likely to be CORSIA eligible and can be used by International Airlines for offsetting their emissions during all phases of CORSIA and therefore requests GCC Steering Committee to append CORSIA Certification label (C+) to this project.

Report (Public) Verification Report (public)
Verification report date 2023-11-30
First Request for Registration Date 2023-12-05