PROJECT DETAILS

Project Submission No. S00636
Project Title 8 MW Hydro Project, Kerala
Project Owner (as per PSF & LOA) Anakampoil Power Private Limited
Submission Date 1 Jul 2022
Global Stakeholder Consultation Period 28 Nov 2022 - 12 Dec 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Hydro Power
GCC/CDM Methodology & Version AMS-1.D- Grid connected renewable electricity Generation, Version -18
Forecasted GHG Emission Reduction (tCO2e/Year) 14,518 (tCO2e/Year)
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Gold
Forecasted Market Eligibility CORSIA(C+)
Country India
Focal Point of Project Owners (FP)
Infinite Environmental Solutions LLP
Email of Contact Person of FP (Primary) jimmy@infisolutions.org
Email of Contact Person of FP (Secondary) sumeet@infisolutions.org
Name of Authorized External Representative Organization Infinite Environmental Solutions LLP
Name of Focal Point of External Representative Jimmy Sah
Email-id of External representative jimmy@infisolutions.org
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

The project activity is installation of 8 MW run off river hydro, that will serve the purpose of producing clean electrical energy in a sustainable manner. The project activity will utilize potential energy of run off river for power generation. Therefore, no fossil fuels are involved for power generation in the project activity. The proposed project activity will also reduce the anthropogenic emissions of greenhouse gases into the atmosphere by avoiding business as usual operation of existing fossil fuels-based power plants to produce equivalent amount of electricity.

Additional Information

The project estimated emission reduction is  14,518 tCO2/ Annum and 145,180 tCO2 over the crediting period which is 10 years.

VERIFICATION OUTCOME
Opinion

LGAI Technological Center S.A. (Applus+ Certification) has performed a verification of the “8 MW Hydro Project, Kerala”. The verification is performed on the basis of GCC criteria project verification standard, Version 3.1 for the project activity, GCC guideline and host country criteria, as well as criteria given to provide for consistent project operations, monitoring and reporting.

The review of the final version of GCC PSF and the subsequent Remote interview / follow-up interviews has provided Applus+ Certification with sufficient evidence to determine the fulfillment of stated criteria. In our opinion, the project meets all relevant GCC project standard requirements for the GCC. The project will hence be recommended by LGAI Technological Center S.A. (Applus+ Certification) for registration with the GCC.

By displacing fossil fuel-based electricity with electricity generated from a renewable source, the project results in reductions of CO2 emissions that are real, measurable and give long-term benefits to the mitigation of climate change. Emission reductions attributable to the project are hence additional to any that would occur in the absence of the project activity. Given that the project is implemented as designed, the project is likely to achieve the estimated amount of annual emission reductions of 14,518 tCO2e per year.

The verification has been performed following the requirements of the latest version of GCC verification standard, Version 03.1 GCC Project Standard, version 03.1 and on the basis of the contractual agreement.

In detail the conclusions can be summarized as follows:

-         The project does not result in negative social, environmental and/or economic impacts.

-         The project contribution to Environment, Social Development and Economic and technological development

-         The project additionality is sufficiently justified in the GCC PSF.

-         Conservative assumptions were applied in the project description.

-         The monitoring plan of SDG parameters is transparent and adequate.

-         The project meets the local stakeholder consultation requirements.

      The conclusions of this report show, that the project, as it was described in the project documentation, is in line with all criteria applicable for the verification.

Report (Public) Verification Report (public)
Verification report date
First Request for Registration Date 2023-07-24