PROJECT DETAILS

Project Submission No. S00077
Project Title Çiğdem Regulators and Hydro Power Plant
Project Owner (as per PSF & LOA) 1. Berke Elektrik Üretim A.Ş. & 2. Desilyon Danışmanlık Ticaret A.Ş. (focal point to act on behalf of all Project Owners)
Submission Date 21 Dec 2021
Global Stakeholder Consultation Period 23 Jan 2022 - 6 Feb 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Hydro Power
GCC/CDM Methodology & Version ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0)
Forecasted GHG Emission Reduction (tCO2e/Year) 23,478 (tCO2e/Year)
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Gold
Forecasted Market Eligibility CORSIA(C+)
Country Türkiye
Focal Point of Project Owners (FP)
Desilyon Danışmanlık Ticaret A.Ş.
Email of Contact Person of FP (Primary) serkan.korkmaz@desilyon.com.tr
Email of Contact Person of FP (Secondary) ozlem@desilyon.com.tr
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

Berke Elektrik Üretim A.Ş. has constructed the Çiğdem Regulator and Hydro Power Plant Project. The aim of the project is to produce electrical energy to the Turkish national grid. The project includes 3 units. Çiğdem 1 has 7.19 MWm/ 6.9 MWe, Çiğdem 2 has 5.3 MWm/ 5.1 Mwe and Çiğdem 3 has 5 MWm/ 4.8 MWe installed capacity. The other one has 0.410 MWm/ 0.406 MWe installed capacity. Therefore, total installed capacity of the project is 17.5 MWm / 16.80 MWe. Annual electricity production is expected to be 43,806,000 kWh according to the generation license. The average annual generated electricity is expected to be 43,806 MWh according to the generation license and the emission reduction is estimated around 23,478 tCO2e annually. For the entire crediting period, 234,783 tonnes of CO2 are expected to be reduced.

Additional Information
VERIFICATION OUTCOME
Opinion

CCIPL was contracted by Desilyon Danışmanlık Ticaret A.Ş for project verification of the project activity “Çiğdem Regulators and Hydro Power Plant” in Turkey. The project verification was performed based on rules and requirements defined by GCC for the project activity.
The project activity is a hydro power project, which results in reductions of CO2e emissions that are real, measurable and give long-term benefits to the mitigation of climate change. It is demonstrated that the project is not a likely baseline scenario and the emission reductions attributable to the project are, hence, additional to any that would occur in the absence of the project activity. The project correctly applies the approved baseline and monitoring ACM0002, Version 20.0 and is assessed against latest valid PS, VS and Environment and Social Safeguards Standard, Project-Sustainability-Standard and/or other applicable GCC/CDM Decisions/Tools/Guidance/Forms.
The project activity is likely to achieve the anticipated emission reductions stated in the PSF provided the underlying assumptions do not change. The expected emission reductions (annual average) from the project activity are estimated to be 21,760 tCO2e/year over the 10 years crediting period starting from 01/01/2017.
CCIPL has informed the project owners of the project verification outcome through the draft project verification report and final project verification report. The final project verification report contains the information with regard to fulfilment of the requirements for project verification, as appropriate.

Report (Public) Verification Report (public)
Verification report date
First Request for Registration Date 2022-05-24
© 2024 Global Carbon Council