Project Submission No. | S00077 |
---|---|
Project Title | Çiğdem Regulators and Hydro Power Plant |
Project Owner (as per PSF & LOA) | 1. Berke Elektrik Üretim A.Ş. & 2. Desilyon Danışmanlık Ticaret A.Ş. (focal point to act on behalf of all Project Owners) |
Submission Date | 21 Dec 2021 |
Global Stakeholder Consultation Period | 23 Jan 2022 - 6 Feb 2022 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
Project Type | Hydro Power |
GCC/CDM Methodology & Version | ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
Forecasted GHG Emission Reduction (tCO2e/Year) | 23,478 (tCO2e/Year) |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
Forecasted SDG+ Goals | |
Forecasted SDG+ Label | Gold |
Forecasted Market Eligibility | CORSIA(C+) |
Country | Türkiye |
---|---|
Focal Point of Project Owners (FP)
|
Desilyon Danışmanlık Ticaret A.Ş. |
Email of Contact Person of FP (Primary) | serkan.korkmaz@desilyon.com.tr |
Email of Contact Person of FP (Secondary) | ozlem@desilyon.com.tr |
Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
Project Brief | Berke Elektrik Üretim A.Ş. has constructed the Çiğdem Regulator and Hydro Power Plant Project. The aim of the project is to produce electrical energy to the Turkish national grid. The project includes 3 units. Çiğdem 1 has 7.19 MWm/ 6.9 MWe, Çiğdem 2 has 5.3 MWm/ 5.1 Mwe and Çiğdem 3 has 5 MWm/ 4.8 MWe installed capacity. The other one has 0.410 MWm/ 0.406 MWe installed capacity. Therefore, total installed capacity of the project is 17.5 MWm / 16.80 MWe. Annual electricity production is expected to be 43,806,000 kWh according to the generation license. The average annual generated electricity is expected to be 43,806 MWh according to the generation license and the emission reduction is estimated around 23,478 tCO2e annually. For the entire crediting period, 234,783 tonnes of CO2 are expected to be reduced. |
---|---|
Additional Information |
Opinion | CCIPL was contracted by Desilyon Danışmanlık Ticaret A.Ş for project verification of the project activity “Çiğdem Regulators and Hydro Power Plant” in Turkey. The project verification was performed based on rules and requirements defined by GCC for the project activity. |
---|---|
Report (Public) | Verification Report (public) |
Verification report date | |
First Request for Registration Date | 2022-05-24 |