PROJECT DETAILS

Project Submission No. S00077
Project Title Çiğdem Regulators and Hydro Power Plant
Project Owner (as per PSF & LOA) 1. Berke Elektrik Üretim A.Ş. & 2. Desilyon Danışmanlık Ticaret A.Ş. (focal point to act on behalf of all Project Owners)
Focal Point of Project Owners*(FP)
Desilyon Danışmanlık Ticaret A.Ş.
Email of Contact Person of FP (Primary) serkan.korkmaz@desilyon.com.tr
Email of Contact Person of FP (Secondary) ozlem@desilyon.com.tr
Country Turkey
Submission Date 21 Dec 2021
Global Stakeholder Consultation Period 23 Jan 2022 - 6 Feb 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0)
Forecasted GHG Emission Reduction(TCO2/Year) 23,478
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals SDG 7, SDG 8, SDG 9, SDG 13
Forecasted SDG+ Label Gold
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization
Name of Focal Point of External Representative
Email-id of Focal Point
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet, Other Documents
Project Brief

Berke Elektrik Üretim A.Ş. has constructed the Çiğdem Regulator and Hydro Power Plant Project. The aim of the project is to produce electrical energy to the Turkish national grid. The project includes 3 units. Çiğdem 1 has 7.19 MWm/ 6.9 MWe, Çiğdem 2 has 5.3 MWm/ 5.1 Mwe and Çiğdem 3 has 5 MWm/ 4.8 MWe installed capacity. The other one has 0.410 MWm/ 0.406 MWe installed capacity. Therefore, total installed capacity of the project is 17.5 MWm / 16.80 MWe. Annual electricity production is expected to be 43,806,000 kWh according to the generation license. The average annual generated electricity is expected to be 43,806 MWh according to the generation license and the emission reduction is estimated around 23,478 tCO2e annually. For the entire crediting period, 234,783 tonnes of CO2 are expected to be reduced.

Additional Information