Project Submission No. | S00437 |
---|---|
Project Title | 180 MW Solar Energy Project in Mesanka, Gujarat |
Project Owner (as per PSF & LOA) | Tata Power Renewable Energy Limited/TP Kirnali Limited |
Focal Point of Project Owners*(FP)
|
Tata Power Renewable Energy Limited |
Email of Contact Person of FP (Primary) | sivanarayana@tatapower.com |
Email of Contact Person of FP (Secondary) | prashant.tiwari@tatapower.com |
Country | India |
Submission Date | 24 Jun 2022 |
Global Stakeholder Consultation Period | 28 Sep 2022 - 12 Oct 2022 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
GCC/CDM Methodology & Version | ACM0002- Grid-connected electricity generation from renewable sources, Version -20 |
Forecasted GHG Emission Reduction(TCO2/Year) | 400,961 |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
---|---|
Forecasted SDG+ Goals | SDG 9,SDG 8,SDG 7,SDG 5, SDG 3,SDG 13 |
Forecasted SDG+ Label | Diamond |
Forecasted Market Eligibility | CORSIA(C+) |
Name of Authorized External Representative Organization | |
Name of Focal Point of External Representative | |
Email-id of Focal Point | |
Documents for Global Stakeholder Consultation | Project Submision, Calculation Sheet, Other Documents |
Project Brief | The Project activity is new green- filed installation of grid- connected 180 MW Solar Power plant for power generation and supply to the National Grid. new The project activity is bundled installation of 120 MW Solar power plant at Mesanka Gujarat and 60 MW Solar power plant at Bikaner, Rajasthan. The total power generation form the project activity is 430,905 MWh of electricity generation, thereby reducing GHG emissions of 400,961 t CO2/Annum into the atmosphere through operation of coal based thermal generation systems in the National grid. Since the project activity is a green-field installation, the baseline and pre-project scenario is similar. |
---|---|