Project Submission No. | S00401 |
---|---|
Project Title | NamKhan 2 |
Project Owner (as per PSF & LOA) | (1) EDL-Generation Public Company and (2) B.B. ENERGY (ASIA) PTE LTD |
Focal Point of Project Owners*(FP)
|
B.B. ENERGY (ASIA) PTE LTD |
Email of Contact Person of FP (Primary) | opsforcarbon@bbenergy.com |
Email of Contact Person of FP (Secondary) | CARBONOPS@BBENERGY.COM |
Country | Lao People's Democratic Republic |
Submission Date | 23 Jun 2022 |
Global Stakeholder Consultation Period | 25 Sep 2022 - 9 Oct 2022 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
GCC/CDM Methodology & Version | ACM0002.: Grid-connected electricity generation from renewable sources, Version 20.0 |
Forecasted GHG Emission Reduction(TCO2/Year) | 317,685 tCO2e |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
---|---|
Forecasted SDG+ Goals | SDG 7, 8, 9, 11 and 13. |
Forecasted SDG+ Label | Platinum |
Forecasted Market Eligibility | CORSIA(C+) |
Name of Authorized External Representative Organization | |
Name of Focal Point of External Representative | |
Email-id of Focal Point | |
Documents for Global Stakeholder Consultation | Project Submision, Calculation Sheet, Other Documents |
Project Brief | The proposed NamKhan 2 project has an nominal installed capacity of 126.2 MW (comprises two units of generator with individual capacity 63.1 MW), however aggregated installed capacity of the turbines are 133.2MW (2x66.6MW each). The estimated annual power generation by the project activity is 567.8GWh will be supplied to regional grid under long term power purchase agreement. The project activity is to meet the power demand in Lao PDR as it is dramatically increasing and the need for more reliable power source is also essential. The purpose of the project activity is to produce renewable energy using hydro power for supplying to grid. In the absence of the project activity equivalent amount of electricity would have been generated by the operation of grid connected fossil fuel-based power plants. The Project activity thus, reduces the anthropogenic emissions of greenhouse gases (GHGs) in to the atmosphere associated with the equivalent amount of electricity generation from the fossil fuel-based grid connected power plant. The project activity commissioned on 28/02/2016 and operational since then. The estimated annual average and the total CO2e emission reduction by the project activity over the crediting period of 10 years are expected to be 317,685 tCO2e and 3,176,850 tCO2e respectively. |
---|---|
Additional Information |