PROJECT DETAILS

Project Submission No. S00655
Project Title Proges Bundled Solar Power Plants
Project Owner (as per PSF & LOA) Proges Enerji Üretim Ticaret Limited Şirketi
Submission Date 20 Jun 2022
Global Stakeholder Consultation Period 29 Nov 2022 - 13 Dec 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Solar Power
GCC/CDM Methodology & Version AMS-I.D: Grid connected renewable electricity generation – Version 18.0
Forecasted GHG Emission Reduction (tCO2e/Year) 12,907 (tCO2e/Year)
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Silver
Forecasted Market Eligibility CORSIA(C+)
Country Türkiye
Focal Point of Project Owners (FP)
Kilittaşı Mühendislik Müşavirlik İnşaat Ticaret Ltd. Şti.
Email of Contact Person of FP (Primary) iperdogan@gmail.com
Email of Contact Person of FP (Secondary) ersozerdogan@gmail.com
Name of Authorized External Representative Organization Kilittasi Mühendislik Müşavirlik İnşaat Tic. Ltd. Şti.
Name of Focal Point of External Representative İncigül Polat Erdogan
Email-id of External representative iperdogan@gmail.com
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

Proges Bundled Solar Power Plants project aims to provide clean energy to the National Grid System of Turkey through while contributing to sustainable development, protecting environment and avoiding Greenhouse gas emissions into the atmosphere. In the absence of the project, same amount of electricity would be used from carbon intensive national grid and would release CO2 into the atmosphere. As a Greenfield activity, project comprises ten identical units of photovoltaic power plants, located in province of Diyarbakir in Turkey. Project has a total installed capacity of 11.92 MWp (10.2 MWe) with an approximate average annual electricity generation of 19.9 GWh. During the 10-year project crediting period, project is expected to achieve 12,907 tCO2 annual emission reductions.

Additional Information
VERIFICATION OUTCOME
Opinion

Re Carbon Gözetim Denetim ve Belgelendirme Ltd. Şti. performed the project verification of the “Proges Bundled Solar Power Plants” in Türkiye between 05/01/2023 and 07/06/2023. The project verification was performed on the basis of UNFCCC criteria for the Clean Development Mechanism (CDM), requirements of GCC project framework v3.0, GCC program manual v4.0, GCC program processes v4.0, GCC project standard v3.1, GCC project sustainability standard v3.1, GCC project verification standard v3.1, GCC Environment & Social safeguards standard v3.0, GCC Program definitions v3.1, ISO 14064-2 & ISO 14064-3, applicable approved CDM Methodology “AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0”, Host Party Criteria and CORSIA requirements.
The project verification was performed by a validation team consisting of “Rohit Badaya as the GCC Project Auditors’ Team Leader, Selen Cilasun as the GCC Project Auditor Trainee, Dr. Seza Danışoğlu as the Financial Expert and Sandeep Kanda as the ITR” and the project activity was checked against the applicable rules and requirements of GCC which are indicated in the above paragraph. In summary, Re Carbon Gözetim Denetim ve Belgelendirme Ltd. Şti.  applied the following verification process and methodology using a competent verification team
•    the desk review of documents and evidences submitted by the project participant in context of the reference GCC rules and guidelines issued.
•    undertaking/conducting remote audit, interviews or interactions with the representative of the project owner,
•    reporting audit findings with respect to clarifications and non-conformities and the closure of the findings, as appropriate.
•    preparing a draft project verification opinion based on the audit findings and conclusions.
•    technical review of the draft verification opinion along with other documents as appropriate by an independent competent technical review team.
•    finalization of the project verification opinion (this report).    

Re Carbon Gözetim Denetim ve Belgelendirme Ltd. Şti. hereby confirm that the proposed project activity “Proges Bundled Solar Power Plants” in Türkiye, applied all relevant EB-guidance as the selected baseline and monitoring methodologies and the associated methodological tools have been applied correctly. The total emission reductions from the project are estimated to be on the average of 12,907 tCO2e per annum over the selected 10 year crediting period. The emission reduction forecast was checked and it is deemed likely that the stated amount will be achieved, given that the underlying assumptions do not change. 
Re Carbon Gözetim Denetim ve Belgelendirme Ltd. Şti. has informed the project owners of the verification outcome through draft project verification report and final project verification report. The final project verification report contains the information with regard to fulfilment of the requirements for verification, as appropriate.
As a result, the project verification team assigned by Re Carbon Gözetim Denetim ve Belgelendirme Ltd. Şti. has verified and hereby certifies that the proposed GCC Project Activity “Proges Solar Bundle Power Plants” in Türkiye 
•    has correctly described the Project Activity in the Project Submission Form (version 1.4, dated 24/05/2023) including the applicability of the approved methodology AMS-I.D. Version 18.0 and meets the methodology applicability conditions, is additional and is expected to achieve the forecasted real and additional GHG emission reductions, complies with the monitoring methodology, has appropriately conducted local and global stakeholder consultation processes and has calculated emission reduction estimates correctly and conservatively 
•    meets all relevant Host Country criteria;
•    meets all relevant requirements of the UNFCCC criteria for the Clean Development Mechanism (CDM), requirements of GCC project framework v3.0, GCC program manual v4.0, GCC program processes v4.0, GCC project standard v3.1, GCC project sustainability standard v3.1, GCC project verification standard v3.1, GCC Environment & Social safeguards standard v3.0, GCC Program definitions v3.1, ISO 14064-2 & ISO 14064-3,
•    its additionality is sufficiently justified in the PSF;
•    is likely to generate GHG emission reductions amounting to the estimated 129,076 tCO2e as indicated in the PSF, which are additional to the reductions that are likely to occur in absence of the Project Activity and complies with all applicable GCC rules, including ISO 14064-2 and ISO 14064-3, and therefore requests the GCC Program to register the Project Activity; 
•    is not likely to cause any net-harm to the environment and/or society and complies with the Environmental and Social Safeguards Standard, and therefore requests the GCC Program to register the Project Activity, which is likely to achieve the requirements of the Environmental No-net-harm Label (E+) and the Social No-net-harm Label (S+); and 
•    is likely to contribute to the achievement of United Nations Sustainability Development Goals (SDGs), comply with the Project Sustainability Standard, and contribute to achieving a total of 3 SDGs, which is likely to achieve the Silver SDG certification label (SDG+) 
•    is likely to contribute to CORSIA Eligible Emission Units and has CORSIA Label (C+) certification valid till 31 December 2020. A written attestation from the Host country on double counting is not required until 31 December 2020 and the project was found meeting the applicable requirements prescribed by ICAO. The Project Activity complies with all the applicable requirements of the GCC Program and ICAO’s requirements on CORSIA Emissions Unit Eligibility Criteria and CORSIA Eligible Emissions Units, as per Clarification No 1., v1.3 paragraph 21-23, and the ACCs expected to be issued during the crediting period is likely to be CORSIA eligible and can be used by International Airlines for offsetting their emissions during all phases of CORSIA and therefore requests GCC Steering Committee to append CORSIA Certification label (C+) to this project.

Therefore, Re Carbon Gözetim Denetim ve Belgelendirme Ltd. Şti. requests the registration of the proposed project activity as a GCC project activity.

Report (Public) Verification Report (public)
Verification report date 2023-12-04
First Request for Registration Date 2023-06-13
© 2024 Global Carbon Council