Project Submission No. | S00354 |
---|---|
Project Title | Gemköprü Hydro Power Plant |
Project Owner (as per PSF & LOA) | Kıvanç Enerji Üretim A.Ş. |
Focal Point of Project Owners*(FP)
|
Kıvanç Enerji Üretim A.Ş. |
Email of Contact Person of FP (Primary) | mehmet@kivanc.com |
Email of Contact Person of FP (Secondary) | mustafa.erdemir@kivanc.com |
Country | Türkiye |
Submission Date | 6 Jun 2022 |
Global Stakeholder Consultation Period | 11 Sep 2022 - 25 Sep 2022 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
GCC/CDM Methodology & Version | AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
Forecasted GHG Emission Reduction(TCO2/Year) | 4,850 |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
---|---|
Forecasted SDG+ Goals | SDG 4, 5, SDG 7, SDG 8, SDG 11 |
Forecasted SDG+ Label | Diamond |
Forecasted Market Eligibility | CORSIA(C+) |
Name of Authorized External Representative Organization | |
Name of Focal Point of External Representative | |
Email-id of Focal Point | mehmet@kivanc.com |
Documents for Global Stakeholder Consultation | Project Submision, Calculation Sheet, Other Documents |
Project Brief | Gemköprü Hydro Power Plant has been developed Kıvanç Enerji Üretim A.Ş. By means of reducing dependency to the fossil fuels, environmental pollution is significantly reduced. Also, clean energy is generated by using hydro power. Regarding to this, Kıvanç Enerji Üretim A.Ş. constructed a hydropower plant in Erkenek district, Malatya province, Turkey. Based on the applied tool, the project boundary is considered as the National Electricity Grid of Turkey. The baseline scenario refers to the energy generation from the fossil fuels. The project includes 2 units where they have 1.00 MWm /0.95 MWe for each. The total installed capacity is 2.00 MWm/1.90 MWe. Annual electricity production is expected to be 8.5 GWh/year. Because of avoiding to use fossil fuels, greenhouse gas emission reductions can be achieved. The average annual generated electricity is expected to be 8,500 MWh according to the feasibility report and the emission reduction is estimated around 4,850 tCO2e annually. |
---|---|
Additional Information |