PROJECT DETAILS

Project Submission No. S00286
Project Title Difer Solar Power Plant Bundle
Project Owner (as per PSF & LOA) 1. G GES 1 Elektrik Üretim Danışmanlık Sanayi Ve Ticaret Ltd. Şti. 2. Desilyon Danışmanlık Ticaret A.Ş. (Focal point to act on behalf of all Project Owners)
Focal Point of Project Owners*(FP)
Desilyon Danışmanlık Ticaret A.Ş.
Email of Contact Person of FP (Primary) serkan.korkmaz@desilyon.com.tr
Email of Contact Person of FP (Secondary) ozlem@desilyon.com.tr
Country Turkey
Submission Date 6 Jun 2022
Global Stakeholder Consultation Period 2 Aug 2022 - 16 Aug 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version AMS-I.D: “Grid connected renewable electricity generation” (Version 18.0)
Forecasted GHG Emission Reduction(TCO2/Year) 10,341
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals SDG 7, SDG 8, SDG 9, SDG 11, SDG 13
Forecasted SDG+ Label Platinum
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization
Name of Focal Point of External Representative
Email-id of Focal Point
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet, Other Documents
Project Brief

Difer Solar Power Plant Bundle constructed by G GES 1 Elektrik Üretim Danışmanlık Sanayi Ve Ticaret Ltd. Şti.. The purpose of the project is to generate clean energy by using solar power and providing the energy to the Turkish national grid. G GES 1 Elektrik Üretim Danışmanlık Sanayi Ve Ticaret Ltd. Şti. consists of 11 individual Unlicensed Polycrystalline Silicon and Monocrystalline Silicon Solar Power Plants with a capacity of 10.830 MWe / 13.813 MWp in total. The total installed capacity is 10.830 MWe. Average annual generated energy is expected to be 20,577 MWh and emission reduction is expected around 13,338 tCO2e (tons of carbon dioxide equivalent) from 2023 per annum. Annual average electricity generation over crediting period is about 15,954 MWh and annual average reduction in emission is about 10,341 tCO2e. For the entire crediting period, 103,410 tCO2e tons of CO2 are expected to be reduced.

Additional Information