Project Submission No. | S00399 |
---|---|
Project Title | Qinshui Huamei Pingshan CMM Power Project |
Project Owner (as per PSF & LOA) | Climate Bridge (Shanghai) Ltd. |
Submission Date | 19 May 2022 |
Global Stakeholder Consultation Period | 22 Sep 2022 - 6 Oct 2022 |
Sector | 8.Mining/Mineral production |
Project Type | CMM |
GCC/CDM Methodology & Version | ACM0008 v08.0 |
Forecasted GHG Emission Reduction (tCO2e/Year) | 172,194 (tCO2e/Year) |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
Forecasted SDG+ Goals | |
Forecasted SDG+ Label | Silver |
Forecasted Market Eligibility | CORSIA(C+) |
Country | China |
---|---|
Focal Point of Project Owners (FP)
|
Climate Bridge (Shanghai) Ltd. |
Email of Contact Person of FP (Primary) | projects@climatebridge.com |
Email of Contact Person of FP (Secondary) | huang.shanfeng@climatebridge.com |
Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
Project Brief | Qinshui Huamei Pingshan CMM Power Project is a power generation project with installed capacity of 6MW, which utilizes low concentration coal mine methane (CMM) for power generation and supplies electricity to North China Power Grid (NCPG). The project locates in Houhe Village, Zhengcun town, Qinshui County, Jincheng City, Shanxi Province, P.R. China. The project is invested and operated by Qinshui Huamei Push New Energy Technology Development Co., Ltd. The project will achieve green-house gas emissions reduction from two sources: 1) Methane (CH4) emissions from the previously vented CMM which will be destroyed by the project; 2) CO2 emissions from the production of electricity by the Project which would otherwise have been generated by the fossil fuel fired power plants of North China Power Grid (NCPG). The project is expected to achieve an annually average emission reduction of 172,194 tCO2e. The total emission reductions during the fixed 10-year crediting period will be 1,721,940 tCO2e. |
---|---|
Additional Information |