Project Submission No. | S00200 |
---|---|
Project Title | Renewable wind power project in India -1- 009 |
Project Owner (as per PSF & LOA) | M/s ReNew Green Energy Solutions Private Limited |
Submission Date | 21 Apr 2022 |
Global Stakeholder Consultation Period | 24 Apr 2022 - 8 May 2022 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
Project Type | Wind Power |
GCC/CDM Methodology & Version | ACM0002 Grid-connected electricity generation from renewable sources - Version 21.0 |
Forecasted GHG Emission Reduction (tCO2e/Year) | 602,739 (tCO2e/Year) |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
Forecasted SDG+ Goals | |
Forecasted SDG+ Label | Silver |
Forecasted Market Eligibility | CORSIA(C+) |
Country | India |
---|---|
Focal Point of Project Owners (FP)
|
M/s/ ReNew Green Energy Solutions Private Limited |
Email of Contact Person of FP (Primary) | nikunj.nangalia@renewpower.in |
Email of Contact Person of FP (Secondary) | prabhat@renewpower.in |
Name of Authorized External Representative Organization | EKI Energy Services Limited |
Name of Focal Point of External Representative | Manish Dabkara |
Email-id of External representative | manish@enkingint.org |
Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
Project Brief | The Project Activity is the installation of a new grid-connected 236.5 MW wind power plant/unit at a site where no renewable power plant was operating prior to the implementation of the project activity (green-field plant). The project is implemented in Andhra Pradesh state of India. The electricity generated from project activity is connected to the Indian grid. The project activity thus reduces the anthropogenic emissions of greenhouse gases (GHGs) associated with equivalent amount of electricity generation from the existing grid connected power plants (mostly fossil fuel based) and from addition of new generation sources into the grid. As the project activity complies to the definition of a Greenfield power plant, therefore the baseline scenario as per paragraph 22 of Section 5.2.1 of applied methodology is “electricity delivered to the grid by the project activity would have otherwise been generated by the operation of grid-connected power plants and by the addition of new generation sources”, as described in the combined margin (CM) calculations described in “TOOL07: Tool to calculate the emission factor for an electricity system”. The project boundary includes the project power plant (project site where the wind power plant has been installed including the wind power plant, power evacuation infrastructure, energy metering points, switch yards and other civil constructions) implemented in the state and all other power plants/units connected physically to the national (Indian) grid that the project power plants is connected to. |
---|---|
Additional Information | M/s KCT Renewable Energy Private Limited, M/s Ostro AP Wind Pvt. Ltd and M/s Ostro Andhra Wind Pvt. Ltd are the SPVs of ReNew Power Private Limited and the project owner is ReNew Green Energy Solutions Private Limited. The project shall result in replacing anthropogenic emissions of greenhouse gases (GHG’s) estimated to be approximately 602,739 tCO2/year, thereon displacing 647,410 MWh/ year amount of electricity from the grid. |