Project Submission No. | S00935 |
---|---|
Project Title | Yenihisar Wind Power Plant |
Project Owner (as per PSF & LOA) | Yeni Enerji Yatırım Üretim ve Ticaret Anonim Şirketi |
Submission Date | 4 Jul 2022 |
Global Stakeholder Consultation Period | 27 Mar 2023 - 10 Apr 2023 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
Project Type | Wind Power |
GCC/CDM Methodology & Version | ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
Forecasted GHG Emission Reduction (tCO2e/Year) | 48,615 (tCO2e/Year) |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
Forecasted SDG+ Goals | |
Forecasted SDG+ Label | Gold |
Forecasted Market Eligibility | CORSIA(C+) |
Country | Türkiye |
---|---|
Focal Point of Project Owners (FP)
|
PROFED ENERJİ ÇEVRE DAN. SAN. VE TİC. LTD. ŞTİ. |
Email of Contact Person of FP (Primary) | kagan.pehlivan@profed.com.tr |
Email of Contact Person of FP (Secondary) | ozge@profed.com.tr |
Name of Authorized External Representative Organization | Profed Enerji Çevre Dan. San. ve Tic. Ltd. Şti. |
Name of Focal Point of External Representative | Kağan Pehlivan |
Email-id of External representative | kagan.pehlivan@profed.com.tr |
Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
Project Brief | Yenihisar Wind Power Plant has been established and operated by Yeni Enerji Yatırım Üretim ve Ticaret Anonim Şirketi. The project involves installation and operation of 9 Nordex N117 turbines with each having 2.4 MWm nominal power. Total installed capacity is 21.6 MWm. The project area is in Didim province of Aydın, Turkey. The annual generation is expected to be 75,000 MWh, according to generation licence. The average annual emission reduction estimated for this project is 48,615 tonnes of CO2. During the crediting period, 486,150 tonnes of CO2 are expected to be reduced. |
---|---|
Additional Information |